Year Completed: | Ongoing |
Project: | NLNG Train 7 Project |
Project description: | Provision of High-density Polyethylene (HDPE) Pipes and Fittings for water applications on Train 7 of the NLNG plant |
Client: | Saipem Contracting Nigeria Ltd/Daewoo E&C JV |
Year Completed: | Ongoing |
Project: | NLNG Train 7 Project |
Project description: | Supply of Glass-fibre Vinyl Ester Epoxy (GRVE) pipes, flanges, and fittings; including site assistance services – training and qualification of GRVE Supervisors, Inspectors and Laminators at Bonny Island project site |
Client: | Saipem Contracting Nigeria Ltd/Daewoo E&C JV |
Year Completed: | Ongoing |
Project: | Provision of Chemical Dosing Pump for Escravos Gas-to-Liquids Project (EGTL) Plant |
Project description: | Supply of Milton Roy Scavenger Chemical Dosing Pump for Escravos Gas-To-Liquid Plant operations |
Client: | Chevron Nigeria Ltd |
Year Completed: | Ongoing |
Project: | Supply of Dosing Pumps for Erha Floating Production Storage and Offloading (FPSO) operations |
Project description: | Provision of Milton Roy Cheical dosing pump and COBRACO spares |
Client: | EXXONMOBIL |
Year Completed: | Ongoing |
Project: | Provision Of Services For Maintenance And Repair Of Valves And Actuators On BONGA Floating Production Storage and Offloading (FPSO) |
Project description: | Calibration, testing, repair and painting of 1inch to 10-inch pressure safety valves, pressure relief and ball valves required for Shell Nigeria Exploration & Production on Bonga Floating Production Storage and Offloading (FPSO) operations. |
Client: | SNEPCO/JOLGRAF |
Year Completed: | Ongoing |
Project: | NLNG Train 7 Project |
Project description: | OEM Designand Supply of of Critical Control valves – Globe and Butterfly type with Antisurge and Hot/Cold Bypass |
Client: | Saipem Contracting Nigeria Ltd/Daewoo E&C |
Year Completed: | Ongoing |
Project: | NLNG Train 7 Project |
Project description: | Provision of Field Joint Laminating Kits required for installation of Glass-fibre Reinforced Vinyl Ester (GRVE) Pipes and fittings at Bonny NLNG Train & project site. |
Client: | Saipem Contracting Nigeria Ltd/Daewoo E&C |
Year Completed: | Ongoing |
Project: | Provision of Ingersoll Rand Air Compressor spares for Seplat Western Assets operations |
Project description: | Procurement and supply of Ingersoll Rand compressor oil filters, ultracoolant, electronic controllers, overload motors, service kits, coolant filters, pressure transducers, air filters, bearings |
Client: | SEPLAT ENERGY PLC |
Year Completed: | Ongoing |
Project: | Provision of Sundyne Maintenance, repair and operations (MROs) for NLNG Plant operations |
Project description: | Procurement and supply of Sundyne Mechanical Seal |
Client: | NLNG |
Year Completed: | Nov – 23 |
Project: | Warri Refinery Quick Fix project |
Project description: | Provision of Pipes, flanges, reducers, gaskets, bolts&nuts for Warri refinery revamp |
Client: | DAEWOO E&C |
Year Completed: | May-23 |
Project: | Provision of Fiber Reinforced Plastics (FRP) Maintenance Services on Chevron Agbami Floating Production Storage and Offloading (FPSO) and joint venture (JV) facilities |
Project description: | Repair of 12 inches GRP Spools on Sea water Line (SWL) 12’’-SW-A-1111 & 12’’- SW-A-1113 on Meren WIP Platform |
Client: | CHEVRON/STARDEEP WATER PETROLEUM |
Year Completed: | Apr-23 |
Project: | Provision of Fiber Reinforced Plastics (FRP) Maintenance Services |
Project description: | Fabrication and Installation of 20” Glass Reinforced Epoxy (GRE) Spacers on the SWLP system (SWLP 1) on Erha Floating Production Storage and Offloading (FPSO) |
Client: | EXXONMOBIL/ SPIE |
Year Completed: | Jan-23 |
Project: | Provision of Rotating Equipment for Erha & Usan Field operations |
Project description: | Supply of Milton Roy Chemical Injection pumps and spares |
Client: | EXXONMOBIL |