Bell Oil & Gas has commenced constructing its OCTG Pipe Threading and Valve Assembly plants at Lekki
Free Zone.
The plants are expected to be completed in the second quarter of 2021.
When completed, the plants will create over a hundred jobs for Nigerians who will be trained on relevant skills that will make them capable of delivering services to international standards.
The project will also meet some of Nigeria’s oil and gas sector’s energy needs. Some of these services include:
- Production of new threads, re-wiring damaged threads, refurbishment of used OCTG. Production of
pup-joints, crossovers, premium pup-joints, and some accessories. Re-threading of damaged pin connections and machining other parts such as lifting plugs, subs, etc. as per specification. - Assembly of new valves, repair, painting, testing and reassembly of damaged valves, calibration of
positioner & gauges, calibration of actuators, retrotting obsolete valves & actuators, valve reconditioning, sandblasting, painting, performing preventative maintenance and health checks on existing valves.
PCC works, rebar works and shuttering works
Reinforced foundation bases
Foundation bases for administrative building
Reinforced casting