Year Completed:2011
Project:Rental of Injection Skid & Metering Pump
Job DescriptionRental of Milton Roy Chemical Injection skid & Electronic metering pump with storage tank Total Odudu Project
Client:Total
Year Completed:2011
Project:Supply of Data Fussion
Project DescriptionSupply of Data Fusion & Art Integration for offshore Security Upgrade Projects.
Client:Delta Afrik Engineering Ltd.
Year Completed:2011
Project:Inspection of IR compressor
Job DescriptionRepair and overhaul of XP 750 IngersollRand Compressor, including servicing of fuel injector of the compressor
Client:Japan International Company Agency (JICA)
Year Completed:2011
Project:Fabrication and Installation of GRE piping
Job DescriptionFabrication and Installation of GRE piping for FSO Unity Oily Water Treatment
Client:Ascot Africa Ltd
Year Completed:2011
Project:Supply of FMC Smith Meter
Project DescriptionSupply of FMC Smith Meter Model: LE3-S3(Standard Trim), Smith Meter Model: LE3-S3(Standard Trim) Master Meter, Accuracy Curve (5 point Flow Test) for Master Meter. (on standard factory test fluid) and Smith Meter In-line Strainers.
Client:ExproTech
Year Completed:2011
Project:UT, Blasting and Painting of Trinity FPSO
Job DescriptionScaffolding, blasting, and painting of all structures, vessels (seperators), piping and manifold on top of the production deck, Cellar deck, skimmer dect and painting at thye boat landing area on Trinity FPSO.
Client:Shebah Exploration & Production Company Ltd
Year Completed:2011
Project:Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Project DescriptionGeneral maintenance of the pumps which include activities like striping of the pumps, inspecting the parts to identify the bad spares and non reusable spares such as O’ Rings, rings etc, for replacement. General cleaning and servicing of the Sundyne pump (1-P-2511A, 2-P-1580B & 3-P-1580B)
Client:NLNG
Year Completed:2011
Project:Engineering Requisition for Asset Tracking Systems UHF Receiver &Transponders
Project Description:Supply of 4 Uhf Asset Tracking System Seetrac Base Unit (Sbu-Mil/G/S) Tt108/S/K, Including High Gain Antenna (Ttag05), Installation Kit Sbu-Ik 3 And 25uhf Asset Tracking System Seetrac Tender Unit (Stu) Tt101/K Including Ttag05 High Gain Antenna, Tts06 Panic Rocker Switch And Installation Kit Stu-Ik 1.
Client:Delta Afrik Engineering Ltd.
Year Completed:2011
Project:Supply of Valve (Breda)
Project DescriptionSupply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type.
Client:Agip
Year Completed:2011
Project:Supply of Milton Roy Chemical Injection package
Project DescriptionChemical Dossing package including factory test & Special tool (Changing Kit for Damper) Engineer, manufacture and assemble in accordance with Company’s project specification.
Client:Chevron
Year Completed:2011
Project:5 Year Preventive and Corrective Maintenance of Loading Arms at NLNG Jetty.
Project DescriptionRemoval,  Overhaul, Repair and Reinstallation of Jetty 1 FMC Loading arms and facilities for NLNG on Bonny Island.
Client:NLNG
Year Completed:2011
Project:Repair of Milton Roy Duplex pump on Cawthorne Channel
Project DescriptionComplete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump
Client:Shell
Year Completed:2011
Project:Installation of GRE Earthing Saddles on GN Platform
Job DescriptionOnshore fabrication and offshore installation, Testing/Commissioning of 2″ 3″ and 4″ fiberglass piping on Mobil GN platform (Additional work on ECIP)
Client:Subsea7 / Globestar
Year Completed:2011
Project:Repair of GRE Fire water network
Job DescriptionFabrication, Installation and Repair of 20″ GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20″ carbon steel and 20′ GRFP line to bellow. Commission and testing of newly installed 20″ GRFP fire water line and casting of proper placement of Neoprene to avoid crack during line movement
Client:Total
Year Completed:2011
Project:Repair of Rapture 2″ x 16″ Saddle Reducer & 6″ FRP Flange
Job DescriptionRepair, Cutting, bonding laminating curing, and installation of 2″ X 6″ FRP flange for sand filter Backwash system, Adjustment of a 4″ FRP spool to accommodate a spacer ring and fixing of  2, 30″ FRP Saddle Reducer 6″ FRP Flange on Akpo FPSO
Client:Total
Year Completed:2011
Project:Supply of Casing
Job DescriptionSupply of size 9-5/8″, 7″ 4-1/2″ van top Casing
Client:Seplat
Year Completed:2011
Project:Supply of Sundyne Gear Box
Job DescriptionSupply of new gear box, 311 Gear Box – 311, S/N 97117228/29 Sundyne Gear Box
Client:NLNG
Year Completed:2011
Project:GRE Repairs GRE Repairs on Ebok MOPU Injection Line
Job DescriptionGRE Repairs on Ebok Mobil Offshore Production Unit Injection Line
Client:Ivorene / Afren
Year Completed:2011
Project:OML-99 GRE Reapir works on Amenam
Project DescriptionRepair of cracked 16″ GRE Fire water pump B at AMP2, Reinfocement of 2 Nos10″Fire hydratant line at AMP 2, Replacement of 2″X28″ GRE Red sad for cooling system at AMP2, Fabrication of 4″ GRE flanged Spool, and fabrication of a 4″ GRE vent Droplet down to the grating.
Client:Total
Year Completed:2011
Project:EAP GN 4th Compressor – Installation of Fiberglass piping on GN Platform
Project descriptionOnshore fabrication and offshore installation, Testing/Commissioning of 2″ 3″ and 4″ fiberglass piping on Mobil GN platform (Additional work on ECIP)
Client:Subsea 7 / Globestar
Year Completed:2011
Project:Repair of MULA Arms 1, 2 and 4 of NACJ
Job DescriptionScaffolding, Weld-repair of defect on MULA 1, Addition of 8 brackets (stiffeners) on MULA 2 and 4 as a preventive action, Carry out Non-Destructive Test (NDT) on weldments, Blast-cleaning of effected areas and coating with anti-corrosion paint.
Client:Julius Berger Nigeria Ltd
Year Completed:2011
Project:Repairs on GRE 4″ Hydrant Crank
Job DescriptionRepair and maintenance work on pump A, GRE 4″ Hydrant crack
Client:Total Akpo
Year Completed:2011
Project:Repair of 2Nos Starter Motors
Job DescriptionDismantling of the Starter Motor, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the the 2Nos Starter Motors.
Client:Japaul
Year Completed:2011
Project:Repair of SP375 Ingersoll Rand Compressor
Job DescriptionRepair of SP375 Ingersoll Rand Compressor, dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor.
Client:Nestoil Group
Year Completed:2011
Project:Supply of OCTG
Job DescriptionSupply of 36″ API SL, X-56, PSL-2 Conductor pipe (OCTG)
Client:Addax Petroleum
Year Completed:2011
Project:GRE repairs on Akpo FPSO
Job DescriptionFabrication, Installation, Repair, and Testing of 6″ & 3″ GRE firewater line for Akpo FPSO
Client:Total
Year Completed:2011
Project:GRE Pipe System Maintenance Services
Job DescriptionFabrication, Installation and Maintenance of Ameron GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Agbami FPSO
Client:Chevron
Year Completed:2011
Project:Repair of Firewater Pump
Job DescriptionRepair, Installation and testing of leaking AMP2 Firewater Pump A&B 8in discharge line at OML – 99 Amenam FPSO
Client:Total
Year Completed:2011
Project:Supply of Ingersoll Rand Cylinder
Job DescriptionSupply of 94 Gasket Valve Seat, 76 Capscrew 28, 56 Valve Check, 48 Cotter Pin 5, 44 Ring,Oli Scapper 9, 43 Retainer Valve 9, 33 Gasket Valve Seat 9, 34 Valve Retainer and 27 Pump Assembly Lubricating Oil Bushing, Ingersoll Rand Compressor Cylinder Spares
Client:Shell
Year Completed:2011
Project:Supply of FMC Loading Arms
Project DescriptionSupply of Loading arms spares which includes Valve Pressure relief, Seal 125-108 20/40, MOCBague De Packing 16″ Secon Cryo, Valve Solenoid, 2POS, Eex “D”, etc. This was used for the Overhaul Spares for the 3 NLNG Marine Loading Arms
Client:NLNG
Year Completed:2011
Project:Specialist Services on Dynamic Fiscalization System in SPDC Forcados Terminal
Project DescriptionSpecialist services of 24″-ASTM API-5L X60, SCH 60,PSL2 pipes on Dynamic Fiscalization System in SPDC Forcados Terminal.
Client:Shell
Year Completed:2011
Project:Supply of FMC Kits
Job DescriptionSupply of FMC PMS for 7 Arms, Stainless Steel Ice Net FOR 4 LNG MLA, Kit of hydraulic & electric for 2 condensate loading arms, 1 set 25T a frame for backward 25 T H 2250mm, 2 frames forward 25 T H 1900mm with HEM etc. For Upgrade of Electrical control system on Jetty 1 DRC 8734.
Client:NLNG
Year Completed:2011
Project:Supply of Shim Crosshead Shoe
Project DescriptionSupply of 5 Random Length of 36 to 40 feet and manufactured to ASME B36.10
Client:Shell
Year Completed:2011
Project:Supply of Ingersoll Rand Con Rod Kit
Project DescriptionSupply of Ingersoll Rand 30 10T Safety Valve, 60 Assy Valve, 70 Con Rod Kit, 80 30-15T Seal Oil, 90 Level Switches, 110 Brg/Conn Rod Kit, 120 Thrust Pin, Crankcase, Centrifugal Unloaded & Pilot Valvea
Client:Shell
Year Completed:2011
Project:Procument of Dosing Pump and Flowmeter
Job DescriptionProcument, Installation and Commissioning of Dosing Pump and Flowmeter on Hypochlorite line at Erha
Client:Exxonmobil
Year Completed:2011
Project:Supply of Flanges
Job DescriptionSupply of 7 24″ flange, 10 20″ flange, 12 20″flange, 16″flange, 2 12″ flange,1 10″ flange, 30 2″ flange, 9 2″ flange, 3  16″ x 20″ eccentric reducer same thickness as pipe, rectangular bar ,1’ x 1/4″,astm a36(18 to 20 ft), 1 plate 3/8″astm a36 (5ft x 20ft), wide flange beam w16 x 40 astm a36 20ft, 28″ flange wn 900# rtj, 24″ flange wn 900# rtj, etc
Client:Exxonmobil
Year Completed:2011
Project:Supply of Line Pipes
Project DescriptionSupply Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M,
24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M. services
Client:ExxonMobil
Year Completed:2011
Project:Grit blasting and painting of Ebugu platform
Project DescriptionGrit blasting and painting of all pipe work and associated support of the topsides and jackets of Ebugu platform OML 123
Client:Addax Petroleum
Year Completed:2011
Project:GRE Repair on OML58
Job DescriptionFabrication, Installation, Repair and Testing of 6″ GRE line on OML58 at Obite
Client:Total
Year Completed:2011
Project:Provision of Specialist Support Sevices for SPDC Metering Department
Project DescriptionProvision of Specialist Support Sevices which includes mob and demob, specialist support, periodic maintenance checks, and reporting for SPDC Metering Department.
Client:Shell
Year Completed:2011
Project:Fabrication, Installation and Repair of Raptureed 12″ & 20″ GRFP Fire Water Line
Job DescriptionFabrication of spool and fittings, cutting of 20″ line damaged section, Bonding of 2, 20″ elbow and flange by fit and reinforced laminations and Mechanical coupling of flanged ends of 20″ carbon steel and 20″ GRFP Fire Water Line
Client:WRPC
Year Completed:2011
Project:Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells
Job DescriptionMultiphase Well Testing of: EBEGORO2T,ALS2T, OBF35LS, OBF36T, OBF37LS, OSHIE8SS, OLEH1LS
Client:Agip
Year Completed:2011
Project:Provision of Multi-phase flowmeter for ETISONG NORTH 1
Job DescriptionProvision of Multi-phase flowmeter for ETISONG NORTH 1 Exploratory well test campaign
Client:Total / ExproTech
Year Completed:2011
Project:Supply of Pipe and Tubings
Project Description18″-API 5L X65 Seamless BE, SCH. 60 Carbon Steel pipes, 12″-ASTM A 333/A 333M B Gr 6 Seamless BE, SCH 120 Carbon Stee pipes, 8″-ASTM A 333/A 3, 4″ and 18″ x 12″ Red Bar Tee SCH. 60 Butt Weld, ASTM A860, GR. WPHY 65 SMLS same thickness as pipe services hydrocarbon.
Client:ExxonMobil
Year Completed:2011
Project:GRE repairs on Akpo FPSO
Job DescriptionRepair of 6″, 8″ & 16″ GRE line & Sand filter on Akpo FPSO
Client:Total
Year Completed:2011
Project:GRE repairs on Erha FPSO
Job DescriptionRepair of 20″ and 40″ GRE line on Fire Water Network Erha FPSO
Client:ExxonMobil
Year Completed:2011
Project:GRE repairs on Firewater networks
Job DescriptionFabrication, Installation and Repair of 20″ GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20″ carbon steel and 20′ GRFP line to bellow. Commission and testing of newly installed 20″ GRFP fire water line and casting of proper placement of Neoprene to avoid crack during line movement
Client:WRPC
Year Completed:2011
Project:Damaged GRE Fire Water Line Repairs
Job DescriptionFabrication, Installation and Repair of GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20′ GRFP line to bellow. Commission and testing of newly installed GRFP fire water lines.
Client:ExxonMobil (EDOP)
Year Completed:2011
Project:Repair & return of Sundyne Compressor Gear Box
Project DescriptionDismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. – Agbami
Client:Chevron
Year Completed:2011
Project:Supply of Cameras
Project DescriptionSupply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras
Client:Delta Afrik Engineering Ltd.
Year Completed:2011
Project:Repair of Compressor for energy works Technology limited
Job DescriptionRepair of 750 Compressor for energy works Technology limited
Client:Nestoil Group
Year Completed:2011
Project:Supply of Milton Roy Parts
Project DescriptionFrame agreement for supply of Milton Roy products & spare parts (NG01010147)
Client:Shell
Year Completed:2011
Project:Supply of Ingersoll Rand Parts
Project DescriptionFrame agreement for supply of Ingersoll Rand spare parts (East and West: NG01010099 & NG01010100)
Client:Shell
Year Completed:2011
Project:Supply of Ingersoll Rand Compressor Spares
Job DescriptionSupply, Installation, Commissioning/Testing of Ingersoll Rand Compressor Spares
Client:Shell
Year Completed:2011
Project:Supply of OMB Valves
Job DescriptionSupply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2)
Client:Exxonmobil
Year Completed:2011
Project:Fabrication and installation of GRE pipes
Project DescriptionFabrication and installation of GRE spool pipes (Delta South)
Client:Chevron
Year Completed:2011
Project:Supply of Ingersoll Rand Valve
Job DescriptionSupply of 19 Element Filter Air, 27 Unloader Valve Ingersoll Rand Valve
Client:Shell
Year Completed:2011
Project:Supply of Line Pipes
Job DescriptionSupply of Line 4″, 16″ & 24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M – line pipes
Client:Addax Petroleum
Year Completed:2011
Project:Repair of Ruptured Downstream Line
Job DescriptionRepair of ruptured 3″ x 6″ line Downstream 46PSV 7311-A at AMP2 (OML 99) Amenam
Client:Total
Year Completed:2011
Project:Supply of Cylinder (FMC)
Job DescriptionSupply of Cylinder, Hydraulic, 125×45-62, Slew, 105bar. Mfg Fmc Technologies, P/N 241100301604023, Drawno 241100390270, Item 408. 6 Cylinder, Hydraulic,140x145c1000,Outboard, Valve, Double, Throttle, Type Aron
Client:Exxonmobil
Year Completed:2011
Project:Kizombe FPSO GRE pipe network site survey
Project DescriptionFabrication, Installation and Maintenance of GRE/ GRP Pipes and Fittings for Esso Exploration Kizombe FPSO projects
Client:Esso Angola
Year Completed:2011
Project:BRT Laoding Arms Repairs
Project DescriptionBRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms
Client:ExxonMobil
Year Completed:2011
Project:Repair OF GRE pipes for Interplant corridor projectOML-99
Project DescriptionSupply, Fabrication & Installation of GRE/Line pipes for interplant corridor project
Client:Chevron
Year Completed:2011
Project:Supply of OMB Products
Project DescriptionBlanket Purchase Agreement/Stock Holding: System Automated Agreement for Supply of OMB Products
Client:ExxonMobil
Year Completed:2011
Project:Supply of  Electroswitch Materials
Project DescriptionBlanket Purchase Agreement/Stock Holding: System Automated Agreement for Electroswitch Materials
Client:ExxonMobil
Year Completed:2011
Project:Supply of Cummins Materials
Project DescriptionBlanket Purchase Agreement/Stock Holding: System Automated Agreement for Cummins Materials
Client:ExxonMobil
Year Completed:2011
Project:Supply of Parker Instrumentation Products.
Project DescriptionBlanket Purchase Agreement/Stock Holding: System Automated Agreement for Parker Instrumentation Products.
Client:ExxonMobil
Year Completed:2011
Project:GRE Piping/Support on Agbami FPSO
Project DescriptionGRE Piping/Support on Agbami FPSO
Client:Chevron
error: Content is protected !!

Abdul-Hakeem Dan’Azimi Bello

Head of Human Resources

Abdul-Hakeem Dan’Azimi Bello is a seasoned Human Resources and administrative leader with over 15 years of professional experience in driving organizational success through strategic human resources management and administrative functions. He has played a pivotal role in defining and implementing comprehensive HR strategies aligned with corporate goals. His expertise extends to talent acquisition, workforce management, training program development, and employee relations, supporting over 100 employees and facilitating major workforce expansions.

Bello has demonstrated a proven ability to manage complex projects, enhance operational efficiency, and foster a strong organizational culture. His technical skills include proficiency in tools like Microsoft Suite, Slack, and HR Information Systems (HRIS), making him adept in optimizing HR functions through data-driven decision-making and process improvement.

In addition to his operational excellence, AD Bello has earned various certifications in HR management and is an Associate of the Chartered Institute of Personnel Management (CIPM). He holds a BSc in Accounting from Bayero University, Kano and an MSc in Treasury Management. He has actively contributed to international HR initiatives and business strategy development.

Ebi Dike

Operations Manager

Ebi Dike is a dynamic and results-oriented operations and project manager. With a successful track record and specialization in pipeline and piping operations and projects spanning over 15 years, Ebi has consistently delivered exceptional results in complex and challenging project environments.
Ebi’s strong leadership abilities have allowed him to effectively coordinate cross-functional teams, fostering collaboration, and ensuring seamless communication throughout project lifecycles. Since his involvement in the Bonga FPSO project in 2004, Ebi has lead project teams on other FPSOs like Erha, Agbami, Akpo, Usan, and Egina. He has also led project teams on other offshore and land production facilities like Total’s Ikike Project, Chevron’s DSO – Meren GGCP & SONAM Projects, Interplant Corridor Escravos Pipeline Project, and Abiteye Sewage Treatment Plant Project.
Ebi’s technical expertise is complemented by his in-depth knowledge of industry regulations, safety protocols, and quality control standards. He consistently applies best practices and innovative solutions to optimize processes, enhance efficiency, and minimize risks. His ability to analyze complex situations and make data-driven decisions has proven invaluable in resolving challenges and delivering successful outcomes. As Operations Manager, Ebi is responsible for managing cross-functional field operations and delivering various complex projects across an array of clients.
Ebi has a Bachelor of Technology Degree in Geology and a Post Graduate Diploma in Computer Information Technology, both from Federal University of Technology, Owerri. He holds certifications in relevant areas such as piping design, equipment maintenance, safety, quality, and project management methodologies. He has also completed several training programmes in engineering design, construction, management, and improvement in operational processes. Ebi also actively pursues continuous learning opportunities and stays updated with the latest industry advancements.
Beyond oil and gas services, Ebi has interests in Systems and Design thinking, Data analytics, Agile concepts and principles, Lean Six Sigma principles, and emerging technologies. He is also an avid reader of different genres. Ebi is keen on making contributions to positively impact his immediate environment and the society at large.

Aigbe Abohi

Finance Manager

Aigbe Abohi is a seasoned professional with almost 10 years cognate industry experience in areas of accounting, financial management, financial planning and reporting, budgeting, and operational finance.

Prior to joining Bell Oil and Gas, he was a General Ledger Manager at Flour Mills of Nigeria Plc where he was responsible for general accounting operations, financial reporting, suggesting, and implementing sound internal control procedures, designing standard operating procedure manuals, preparing annual audited financial statements, as well as leading and coordinating external audit exercises for various companies in the agro allied value chain. He had also functioned as a finance and accounts team lead in other organizations where he oversaw finance and management reporting, accounts payables and receivables, inventory, payroll as well as fixed assets management.

In his current role at Bell Oil and Gas, he is responsible for supervising the finance team, coordinating a variety of finance and accounts activities including general accounting, accounts payables, payroll and treasury management, financial reporting and budgeting amongst others.
He holds a bachelor’s degree in Accounting from the University of Benin, and is a member of the Institute of Chartered Accountants of Nigeria (ICAN).

His hobbies include studying, sports, music, movies and networking.

Chinwe Ama-Boms

Plant Manager, OCTG Threading and Machining Plant

Chinwe is a result-driven and seasoned engineer with a proven history of plant setup and production optimization through improved efficiency, cost and waste reduction, enhanced product quality and resource management. He believes in getting it right the first time.
Chinwe is skilled in team leadership, training and development, strategic planning and innovative problem-solving.
This has been proven in 17+ years of professional experience in OCTG precision manufacturing where he has managed daily plant operations, ensuring safety with zero LTI, high product quality with zero scrap and enhanced productivity, leading cross-functional teams to achieve production targets and optimize processes, implementing cost-saving initiatives, resulting in significant expense reduction.
Chinwe holds a Bachelor of Engineering degree in Electrical/Electronic Engineering from the University of Port Harcourt and has acquired several tailored certifications in quality and production optimization.
Beyond oil and gas, he has an interest in family, reading different genres and good governance.

DR. (Engr). Chima Ibeneche

Chairman, Board of Directors

Dr. (Engr.) Chima has over 31 years of experience in the oil and gas industry. He spent his first three years with Schlumberger where he started out in 1978. He joined The Shell Petroleum Development Company (SPDC) in 1986. Chima was sent overseas on assignment as Senior Petrophysicist, Land Operations, in  Nederlandse Aardolle Maatschaappij, a Shell/ Esso company in Assen, northern Netherlands. He returned to Nigeria in 1989 to become the Divisional Chief Petrophysicist. He was later appointed Chief Petroleum Engineer in the Western Division of The Shell Petroleum Development Company of Nigeria (SPDC).

Dr. Chima drilled the first horizontal well in Shell’s operations in Nigeria. From 1994 to 1999, he served as the Petroleum Economist for Europe and Africa at Shell International Headquarters in The Hague, Holland; Acting Petroleum Engineering Manager, Western Division; Human Resources Manager; and Deputy Development Director and Corporate Well Engineering Manager and Service Director at SPDC. In 2004, he became the Managing Director of Shell Nigeria Exploration and Production Company (SNEPCo), pioneering offshore and deep-water exploration and production operations in Nigeria and bringing on stream the Bonga field. Chima joined NLNG in 2008 as the first Nigerian Managing Director from The Shell Petroleum Development Company of Nigeria (SPDC), a position he held between 2008 and 2012. During the same period, he was the Executive VP of Bonny Gas Transport Limited.

As the Chairman Board of Directors in Bell Oil & Gas, he is responsible for leading the Board on strategic matters and guiding the company on its strategic direction. Dr. Chima holds a degree in Electronics and Electrical Engineering from the University of Nigeria, Nsukka and a Doctorate Degree Honoris causa in Production Management from the Federal University of Technology, Owerri. He is a member of the Society of Petroleum Engineers (SPE), Institute of Directors and the Nigerian Economic Summit Group. He is also the former president of the Nigerian Gas Association and a fellow of the Energy Institute of London. He also serves on the board of several notable companies.

EJIRO ERIVONA

Position: Assistant General Manager

Ejiro Erivona has over 20 years of international experience in the upstream sector of the oil and gas industry. His expertise spans Business Operations Management , Business Development, Contracts and process management in the oil service industry as well as the Exploration and production segment of the Oil and Gas Business. 

He has managed key business divisions for various multinationals like Falcon, General Electric and Baker Hughes, working in various countries in Africa and North America, leading multidisciplinary and multicultural teams to achieve stellar business outcomes. Most recently, he held the position of Senior Manager, Operations at Nigeria’s Major E&P Independent- Conoil Producing Nigeria. 

Experienced in business startups, as well as new business generation, Ejiro has a track record of closing major deals in the IOCs, NOCs and marginal field operators in the sub-continent. 

He holds a Master of Business Administration (MBA) from the university of wales and a Bachelor of Science in Computer Science from the University of Benin. He is also an alumnus of the Administrative College of India ( ASCI) 

Ejiro has a “Black Belt” in people and change management and has pursued the same with great flair. 

KAYODE THOMAS

Chief Executive Officer

With a solid background in corporate strategy, business development, project management, business analysis and supply chain management, gained from key positions with various blue chip organisations, Kayode has many years international and domestic experience in driving businesses to achieve their strategic and corporate goals.

Prior to Bell Oil & Gas Ltd, he managed and delivered various strategic projects for multi-national corporations in Europe including business process re-engineering, organisation design, change management, ERP solutions, mergers & acquisitions, and post-merger business integration. He held strategic positions in different organisations including the Nigerian National Petroleum Corporation (London office), British Telecommunications (UK), Johnson & Johnson (UK), Cable & Wireless (UK) and GlaxoSmithKline (UK) where he managed and developed supply chain processes, new product introduction models, sales and operations planning policies, product rationing strategies, customer services and performance management methodologies across Europe. His various achievements led to him being named the Glaxo Wellcome IIP Award winner in 1998.

A finalist at the 2011 Ernst & Young Entrepreneur of the Year Award, and a founding director of Bell Oil & Gas, Kayode is a seasoned entrepreneur with a successful track record of leadership in cross-functional teams. At Bell Oil & Gas Ltd where he has held the position of CEO since inception, Kayode is responsible for corporate strategy, business planning, major projects development, change management, corporate governance, strategic alliances, brand management and corporate social responsibility. He is also responsible for the overall direction, growth and expansion of the company.

A strong advocate of continuous learning, Kayode is an ardent reader of a range of books covering leadership, motivation, relationship building, crime, autobiographies, and Christian literature. He is also a presenter and speaker at international conferences with specific interests in Strategic Alliances, Nigerian Content, and Entrepreneurship.

Kayode is an avid animal lover, with interests in exotic breeds of dogs, parrots, horses and wildlife. He is also a staunch Formula 1 follower, a lover of cricket, rugby, snooker, polo and sailing.

A Harvard Business School and Warwick Business School alumnus, Kayode is a highly motivated and articulate professional who brings with him, deep business insights, strategic thinking, and extensive management and business development experience and expertise spanning many key business areas.

A Certified Management Consultant (CMC), Kayode serves on the board of a number of companies, including several start-ups, provides advisory services to many organisations, within and outside the oil industry and supports young aspiring entrepreneurs in translating ideas into business reality. Kayode is also the founder and chairman of Rifugio Communications, a leading mobile phone retail and enterprise solutions provider in Nigeria. He holds a B.SC (Hons) Degree in Physics, an MSc in Advanced Manufacturing Systems, an MBA and a Doctorate Degree in Business Administration with research interest in Strategic Alliances and Implications for Local Capacity Development in the Nigerian Oil & Gas industry.

Kayode is a member of the Institute of Directors, the Nigerian Institute of Management and a Fellow of the Institute of Management Consultants (IMC-Nigeria).