BOG Completes Set-Up of Valve Assembly Plant

BOG Valve engineers receiving painting instructions at the Plant. BOG Valve engineers disassembling an 8″ ball valve at the Vave Assembly Plant.   We have now completed the set-up of our ultra-modern Valve Assembly Plant situated in Lekki Free Zone, the first of its kind in Lagos State. Equipment, capable of assembling, testing, certifying, and painting […]

How to Maximize Time to Achieve Your Goals for 2022

What happened to the first half of 2022? It feels like January a few days ago. We are already midyear and some of us are wondering where all our me went, especially when we have barely achieved any of the goals we set for ourselves at the beginning of the year. Time helps to measure our activities […]

0.5-Inch Hydraulic Hose Re-termination/ Crimping on Bonga FPSO

A team of engineers from the Rotating Equipment (RE) Unit carried out the repair and refurbishment of an Ingersoll Rand (IR) diesel-driven engine air compressor at Mobil Qua Iboe Terminal (QIT ) Eket for 29 days. The repair will ensure the Ingersoll Rand compressor optimization for better efficiency.  Qua Iboe terminal is an oil pipeline […]

BOG Partners with Continental Disc Corporation and Groth Corporation to Offer World Class Pressure Safety Solutions

As part of our strategic alliance model for local capacity development,  BOG has signed an exclusive partnership agreement with Continental Disc Corporation and Groth Corporation, world leaders based in the USA and specialized in the manufacturing of pressure management solutions across the globe. Their products are divided into two main categories which include: Groth Corporation […]

Bell Oil and Gas Participates at Shell Mechanical Engineers’ Forum

On the 24th of March, Bell Oil and Gas (BOG) participated in the Q1 2022 Shell Companies in Nigeria (SCiN) Virtual Mechanical Engineers’ forum. This forum had in attendance over two hundred engineers from the different Shell companies in Nigeria. A “Technical Capability Presentation” by Bell Oil and Gas was anchored by Mr. Adedeji Adeyemi, […]

Bell Oil and Gas Completes Ingersoll Rand Compressor Repair For Mobil

A team of engineers from the Rotating Equipment (RE) Unit carried out the repair and refurbishment of an Ingersoll Rand (IR) diesel-driven engine air compressor at Mobil Qua Iboe Terminal (QIT ) Eket for 29 days. The repair will ensure the Ingersoll Rand compressor optimization for better efficiency.    Qua Iboe terminal is an oil […]

Project Evolution – Bell Oil and Gas Commences Valve Assembly Training

In preparation for BOG’s valve assembly plant commissioning, the company commenced a training program for the team on January 31st, 2022. The training is in line with BOG’s focus to develop  a highly-skilled workforce to achieve excellence in delivering valve services to clients. The valve assembly training covers the following : Valve machine setup Installation […]

International Women’s Day : A Message from CEO Kayode Thomas

In this message, Dr. Kayode Thomas, CEO of Bell Oil and Gas, shares his thoughts and congratulatory message to women on  International Women’s Day, 8 March 2022.   I join the global community to commemorate International Women’s Day. I celebrate every woman who consistently breaks the bias and actively uses her strengths and skills to […]

BOG’S 20th Anniversary: CEO’s Appreciation Message

Dear all, It gives me great pleasure, accompanied by a flurry of emotions that cannot be described, to celebrate our 20th anniversary with everyone. Everyone should be encouraged by and proud of the BOG story. I certainly am. If you dig deeper, it is most inspiring. Although I was there from the very beginning, I […]