| Year Completed: |  | 2010 | 
| Project: |  | Kizombe FPSO GRE pipe network site survey | 
| Job Description |  | Fabrication, Installation and Maintenance of GRE Pipes and Fittings for Esso Exploration Angola Projects | 
| Client: |  | Esso Angola / Worley parsons | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Valves (Hydrasun) | 
| Job Description |  | Supply of Supply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type. (Hydrasun) | 
| Client: |  | ExproTech | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of OMB Valves | 
| Job Description |  | Supply of Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2) | 
| Client: |  | Delta Afrik Engineering Ltd. | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Line Pipes | 
| Job Description |  | Supply of Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M, 24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M. line pipes services | 
| Client: |  | Exxonmobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Repair & return of Sundyne Compressor Gear Box | 
| Project Description |  | Dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. – Agbami | 
| Client: |  | Chevron | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Cameras | 
| Project Description |  | Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras | 
| Client: |  | Delta Afrik Engineering Ltd. | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Provision of Multi-phase flowmeter for Well Testing Campaign | 
| Job Description |  | Provision of Multiphase Flowmeter for Well Testing Campaign in Land and Swamp of six wells: ALS2T, OBF3LS, OBF35SS,OBF36T,OBF37SS,OBF37LS | 
| Client: |  | Agip | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Bonding & lamination of GRE piping and hoses | 
| Job Description |  | Bonding & Lamination of 8″ and 12″ GRE piping and flexible hoses on Akpo FPSO | 
| Client: |  | Total | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Procurement, Fabrication, Installation and Repair of 12″ GRFP Fire Water Line | 
| Job Description |  | Procurement, Fabrication, Installation and Repair of 12″ GRFP Fire Water Line. Isolation of 12 GRFP 12″ line at N street, cutting out of damaged 12″ line, Fabrication of spool, Reinstatement of two 12″ line by fit lamination,Bolting & Installation of Valves with corresponding bolts and nuts and hydro test/Commissioning of all 12 ” lines | 
| Client: |  | WRPC | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Elbow (Kurvers) | 
| Job Description |  | Supply of Support Saddle, 14″ saddle 180 L 4″ TC421709, U-Bolt, M16; 14″ Neoprene coated, Adhesive Kit, RP 60B 60Z, Conductive Adhesive Kit U 60060101. (Kurvers) | 
| Client: |  | Exxonmobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | GRE Piping/Support on Agbami FPSO | 
| Project Description |  | Fabrication, Installation, Repair and Testing of GRE lines for GRE Piping/Support on Agbami FPSO | 
| Client: |  | Chevron – Agbami | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Ameron Pipes | 
| Job Description |  | Supply of Ameron Pipes, 90 degree FRP elbow (2000m) quick lock size 10, 1 HD flange 10″ & 8″ FRP size 250mm, 8″ & 10″ Gasket 180 RE, 3mm thickness, 16 8″ FRP pipes (200mm) plain end, 10 10″ FRP pipes 250mm plain end, 2 12″ FRP pipes 300mm plain end, 20″ FRP pipes 500mm plain end and Lamination kits 400mm reinforced kits | 
| Client: |  | Chevron | 
|  |  |  | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Repairs and maintenance of GRE waterline | 
| Job Description |  | Repairs and maintenance of GRE waterline | 
| Client: |  | TOTAL ( Akpo) | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | GRE Piping Repair | 
| Job Description |  | Fabrication, Installation, Repair and Hydro/ Commissioning of 10″ GRE line on Minox 2 | 
| Client: |  | Chevron – Agbami | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Fittings | 
| Job Description |  | Supply of 16″ Elbow SCH 80 DEG. LR, 16″ 0.0 x 0.844″ W.T 90 DEG,  12″ SCH 80. 45 DEG and 6″ Gasket 900 Oval Ring Fittings  (St Louis) | 
| Client: |  | Chevron | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Compressor Parts (Dresser) | 
| Job Description |  | Supply of Compressor Parts (Dresser), (22) 4.1/2 X 4.1/2 X 3.1/4 X 3.1/2 ” Compressor Section Valve Complete 30 3w21449t Inlet & Discharge Hp,( 26) 5 In Diameter Piston And Cylinder Assembly, | 
| Client: |  | Shell | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Valves | 
| Job Description |  | Supply of Valves (Parker) | 
| Client: |  | Shell | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Line Pipes | 
| Job Description |  | Supply of 70KM 4″ & 6″ Bare and 3 Layer PE Coated Sch 80 & Sch 120 API 5L X 52 Seamless Line Pipes | 
| Client: |  | Agip | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Provision of Proverloop | 
| Job Description |  | Provision, Installation and Commission of 12″ Bi-directional Proverloop for NGL line in EPCL, | 
| Client: |  | Agip | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Provision of Crude Storage and Trucking | 
| Job Description |  | Provision of Crude Storage Tank and Trailers for trucking during DST | 
| Client: |  | Addax Petroleum | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Gas Turbine Generator Governor | 
| Job Description |  | Supply of Gas Turbine Generator EGS-Esses Governor Service | 
| Client: |  | Total | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Valves | 
| Job Description |  | Supply of HRA 20″ x 20 ANSI 600 RF/ RF manual operatted Ball Valves (Tyco Valves) | 
| Client: |  | Chevron | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Fabrication, installation of fire waterline (GRE) | 
| Job Description |  | Fabrication, installation and re-routing of 20″ fire waterline (GRE) | 
| Client: |  | WRPC | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Condition Monitoring of Ingasoll Rand Compressor | 
| Job Description |  | Condition Monitoring & Assessment of Ingasoll Rand Compressors in all Mobil facilities | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Line Pipes | 
| Job Description |  | Supply of 20’’-ASTM A 333 Gr 6 Seamless BE SCH 120, Seamless Carbon Steel Pipe, All Pipes Are Of Single Random Length of 18 To 20 Feet and Manufactured To ASTM A 333 Gr 6. M. Service: Hydrocarbon. | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Intellysis repairs | 
| Job Description |  | 4 Nos Intellysis repairs | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Provision of Multi-phase flowmeter for Well Testing Campaign | 
| Job Description |  | Multiphase Well Testing of three wells: KWL3SS, KWL11SS & KWL11LS and OBF36T,UMR4T, UMR5T, UMR6T & IDU7T in Land and Swamp wells | 
| Client: |  | Agip | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Fabrication and installation of fire waterline (GRE) | 
| Job Description |  | Fabrication and installation and re-routing of 12 inch fire waterline (GRE) | 
| Client: |  | WRPC | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Repairs and maintenance of waterline (GRE) | 
| Job Description |  | Repairs and maintenance of GRE waterline: 1. 8Nos 6″ GRE repair on sea water sand filter A – H,  2. 30″ GRE TEE repair on 42″ sea water overboard line,  3. 3″ & 4″ GRE repair on S4 & P4 Fire Hydrant Lines,  4. Repair of 14″ (14×10 reducer) GRE line on fire pump A | 
| Client: |  | Total | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Line Pipes | 
| Job Description |  | Supply of 59KM 4″ 3 Layer PE Coated Schedule 80 API 5L X 52 Seamless Line Pipes (8.4mm thickness) | 
| Client: |  | Agip | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Repair of broken chlorination unit discharge spool | 
| Job Description |  | Onshore fabrication and offshore installation of broken CPVC pipes | 
| Client: |  | Total | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Data Fussion | 
| Project Description |  | Supply of Data Fusion & Art Integration for offshore Security Upgrade Projects. | 
| Client: |  | Delta Afrik Engineering Ltd. | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp Wells | 
| Job Description |  | Multiphase Well Testing of eight wells: Obk16SS, 16LS, Obf14LS, 15T, 35SS, 35LS, 37SS & 37LS for Well Testing Campaign in Land and Swamp Wells | 
| Client: |  | NAOC | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Fabrication and installation of GRE pipes | 
| Project Description |  | Fabrication and installation of GRE spool pipes (Delta South) | 
| Client: |  | Chevron (Delta South) | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | BRT Laoding Arms Repairs | 
| Project Description |  | BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Operation & Maintenance For 2 years NACJ – Marine Unloading Arm Package | 
| Project Description |  | Operation & Maintenance of Loading Arms: 24-hour Operation, monitoring, repair & maintenance of 4 Loading Arms for loading and offloading of petroleum products at the New Atlas Cove Jetty; Stocking of spares for maintenance. | 
| Client: |  | Julius Berger Nigeria Ltd | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Repair OF GRE pipes for Interplant corridor projectOML-99 | 
| Project Description |  | Supply, Fabrication & Installation of GRE/Line pipes for interplant corridor project | 
| Client: |  | Chevron | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps | 
| Project Description |  | Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps | 
| Client: |  | NLNG | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of OMB Products | 
| Project Description |  | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Supply of OMB Products | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of  Electroswitch Materials | 
| Project Description |  | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Electroswitch Materials | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Cummins Materials | 
| Project Description |  | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Cummins Materials | 
| Client: |  | ExxonMobil | 
|  |  |  | 
| Year Completed: |  | 2010 | 
| Project: |  | Supply of Parker Instrumentation Products. | 
| Project Description |  | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Parker Instrumentation Products. | 
| Client: |  | ExxonMobil |