Year Completed: | | 2010 |
Project: | | Kizombe FPSO GRE pipe network site survey |
Job Description | | Fabrication, Installation and Maintenance of GRE Pipes and Fittings for Esso Exploration Angola Projects |
Client: | | Esso Angola / Worley parsons |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Valves (Hydrasun) |
Job Description | | Supply of Supply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type. (Hydrasun) |
Client: | | ExproTech |
| | |
Year Completed: | | 2010 |
Project: | | Supply of OMB Valves |
Job Description | | Supply of Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2) |
Client: | | Delta Afrik Engineering Ltd. |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Line Pipes |
Job Description | | Supply of Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M, 24″-ASTM API-5L X60, SCH 60,PSL2, double random length of 36 to 40 feet and manufactured to ASME B36.10 M. line pipes services |
Client: | | Exxonmobil |
| | |
Year Completed: | | 2010 |
Project: | | Repair & return of Sundyne Compressor Gear Box |
Project Description | | Dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. – Agbami |
Client: | | Chevron |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Cameras |
Project Description | | Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras |
Client: | | Delta Afrik Engineering Ltd. |
| | |
Year Completed: | | 2010 |
Project: | | Provision of Multi-phase flowmeter for Well Testing Campaign |
Job Description | | Provision of Multiphase Flowmeter for Well Testing Campaign in Land and Swamp of six wells: ALS2T, OBF3LS, OBF35SS,OBF36T,OBF37SS,OBF37LS |
Client: | | Agip |
| | |
Year Completed: | | 2010 |
Project: | | Bonding & lamination of GRE piping and hoses |
Job Description | | Bonding & Lamination of 8″ and 12″ GRE piping and flexible hoses on Akpo FPSO |
Client: | | Total |
| | |
Year Completed: | | 2010 |
Project: | | Procurement, Fabrication, Installation and Repair of 12″ GRFP Fire Water Line |
Job Description | | Procurement, Fabrication, Installation and Repair of 12″ GRFP Fire Water Line. Isolation of 12 GRFP 12″ line at N street, cutting out of damaged 12″ line, Fabrication of spool, Reinstatement of two 12″ line by fit lamination,Bolting & Installation of Valves with corresponding bolts and nuts and hydro test/Commissioning of all 12 ” lines |
Client: | | WRPC |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Elbow (Kurvers) |
Job Description | | Supply of Support Saddle, 14″ saddle 180 L 4″ TC421709, U-Bolt, M16; 14″ Neoprene coated, Adhesive Kit, RP 60B 60Z, Conductive Adhesive Kit U 60060101. (Kurvers) |
Client: | | Exxonmobil |
| | |
Year Completed: | | 2010 |
Project: | | GRE Piping/Support on Agbami FPSO |
Project Description | | Fabrication, Installation, Repair and Testing of GRE lines for GRE Piping/Support on Agbami FPSO |
Client: | | Chevron – Agbami |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Ameron Pipes |
Job Description | | Supply of Ameron Pipes, 90 degree FRP elbow (2000m) quick lock size 10, 1 HD flange 10″ & 8″ FRP size 250mm, 8″ & 10″ Gasket 180 RE, 3mm thickness, 16 8″ FRP pipes (200mm) plain end, 10 10″ FRP pipes 250mm plain end, 2 12″ FRP pipes 300mm plain end, 20″ FRP pipes 500mm plain end and Lamination kits 400mm reinforced kits |
Client: | | Chevron |
| | |
| | |
Year Completed: | | 2010 |
Project: | | Repairs and maintenance of GRE waterline |
Job Description | | Repairs and maintenance of GRE waterline |
Client: | | TOTAL ( Akpo) |
| | |
Year Completed: | | 2010 |
Project: | | GRE Piping Repair |
Job Description | | Fabrication, Installation, Repair and Hydro/ Commissioning of 10″ GRE line on Minox 2 |
Client: | | Chevron – Agbami |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Fittings |
Job Description | | Supply of 16″ Elbow SCH 80 DEG. LR, 16″ 0.0 x 0.844″ W.T 90 DEG, 12″ SCH 80. 45 DEG and 6″ Gasket 900 Oval Ring Fittings (St Louis) |
Client: | | Chevron |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Compressor Parts (Dresser) |
Job Description | | Supply of Compressor Parts (Dresser), (22) 4.1/2 X 4.1/2 X 3.1/4 X 3.1/2 ” Compressor Section Valve Complete 30 3w21449t Inlet & Discharge Hp,( 26) 5 In Diameter Piston And Cylinder Assembly, |
Client: | | Shell |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Valves |
Job Description | | Supply of Valves (Parker) |
Client: | | Shell |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Line Pipes |
Job Description | | Supply of 70KM 4″ & 6″ Bare and 3 Layer PE Coated Sch 80 & Sch 120 API 5L X 52 Seamless Line Pipes |
Client: | | Agip |
| | |
Year Completed: | | 2010 |
Project: | | Provision of Proverloop |
Job Description | | Provision, Installation and Commission of 12″ Bi-directional Proverloop for NGL line in EPCL, |
Client: | | Agip |
| | |
Year Completed: | | 2010 |
Project: | | Provision of Crude Storage and Trucking |
Job Description | | Provision of Crude Storage Tank and Trailers for trucking during DST |
Client: | | Addax Petroleum |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Gas Turbine Generator Governor |
Job Description | | Supply of Gas Turbine Generator EGS-Esses Governor Service |
Client: | | Total |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Valves |
Job Description | | Supply of HRA 20″ x 20 ANSI 600 RF/ RF manual operatted Ball Valves (Tyco Valves) |
Client: | | Chevron |
| | |
Year Completed: | | 2010 |
Project: | | Fabrication, installation of fire waterline (GRE) |
Job Description | | Fabrication, installation and re-routing of 20″ fire waterline (GRE) |
Client: | | WRPC |
| | |
Year Completed: | | 2010 |
Project: | | Condition Monitoring of Ingasoll Rand Compressor |
Job Description | | Condition Monitoring & Assessment of Ingasoll Rand Compressors in all Mobil facilities |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Line Pipes |
Job Description | | Supply of 20’’-ASTM A 333 Gr 6 Seamless BE SCH 120, Seamless Carbon Steel Pipe, All Pipes Are Of Single Random Length of 18 To 20 Feet and Manufactured To ASTM A 333 Gr 6. M. Service: Hydrocarbon. |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Intellysis repairs |
Job Description | | 4 Nos Intellysis repairs |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Provision of Multi-phase flowmeter for Well Testing Campaign |
Job Description | | Multiphase Well Testing of three wells: KWL3SS, KWL11SS & KWL11LS and OBF36T,UMR4T, UMR5T, UMR6T & IDU7T in Land and Swamp wells |
Client: | | Agip |
| | |
Year Completed: | | 2010 |
Project: | | Fabrication and installation of fire waterline (GRE) |
Job Description | | Fabrication and installation and re-routing of 12 inch fire waterline (GRE) |
Client: | | WRPC |
| | |
Year Completed: | | 2010 |
Project: | | Repairs and maintenance of waterline (GRE) |
Job Description | | Repairs and maintenance of GRE waterline: 1. 8Nos 6″ GRE repair on sea water sand filter A – H, 2. 30″ GRE TEE repair on 42″ sea water overboard line, 3. 3″ & 4″ GRE repair on S4 & P4 Fire Hydrant Lines, 4. Repair of 14″ (14×10 reducer) GRE line on fire pump A |
Client: | | Total |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Line Pipes |
Job Description | | Supply of 59KM 4″ 3 Layer PE Coated Schedule 80 API 5L X 52 Seamless Line Pipes (8.4mm thickness) |
Client: | | Agip |
| | |
Year Completed: | | 2010 |
Project: | | Repair of broken chlorination unit discharge spool |
Job Description | | Onshore fabrication and offshore installation of broken CPVC pipes |
Client: | | Total |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Data Fussion |
Project Description | | Supply of Data Fusion & Art Integration for offshore Security Upgrade Projects. |
Client: | | Delta Afrik Engineering Ltd. |
| | |
Year Completed: | | 2010 |
Project: | | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp Wells |
Job Description | | Multiphase Well Testing of eight wells: Obk16SS, 16LS, Obf14LS, 15T, 35SS, 35LS, 37SS & 37LS for Well Testing Campaign in Land and Swamp Wells |
Client: | | NAOC |
| | |
Year Completed: | | 2010 |
Project: | | Fabrication and installation of GRE pipes |
Project Description | | Fabrication and installation of GRE spool pipes (Delta South) |
Client: | | Chevron (Delta South) |
| | |
Year Completed: | | 2010 |
Project: | | BRT Laoding Arms Repairs |
Project Description | | BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Operation & Maintenance For 2 years NACJ – Marine Unloading Arm Package |
Project Description | | Operation & Maintenance of Loading Arms: 24-hour Operation, monitoring, repair & maintenance of 4 Loading Arms for loading and offloading of petroleum products at the New Atlas Cove Jetty; Stocking of spares for maintenance. |
Client: | | Julius Berger Nigeria Ltd |
| | |
Year Completed: | | 2010 |
Project: | | Repair OF GRE pipes for Interplant corridor projectOML-99 |
Project Description | | Supply, Fabrication & Installation of GRE/Line pipes for interplant corridor project |
Client: | | Chevron |
| | |
Year Completed: | | 2010 |
Project: | | Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps |
Project Description | | Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps |
Client: | | NLNG |
| | |
Year Completed: | | 2010 |
Project: | | Supply of OMB Products |
Project Description | | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Supply of OMB Products |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Electroswitch Materials |
Project Description | | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Electroswitch Materials |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Cummins Materials |
Project Description | | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Cummins Materials |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2010 |
Project: | | Supply of Parker Instrumentation Products. |
Project Description | | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Parker Instrumentation Products. |
Client: | | ExxonMobil |