Year Completed: | 2011 | |
Project: | Rental of Injection Skid & Metering Pump | |
Job Description | Rental of Milton Roy Chemical Injection skid & Electronic metering pump with storage tank Total Odudu Project | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | Supply of Data Fussion | |
Project Description | Supply of Data Fusion & Art Integration for offshore Security Upgrade Projects. | |
Client: | Delta Afrik Engineering Ltd. | |
Year Completed: | 2011 | |
Project: | Inspection of IR compressor | |
Job Description | Repair and overhaul of XP 750 IngersollRand Compressor, including servicing of fuel injector of the compressor | |
Client: | Japan International Company Agency (JICA) | |
Year Completed: | 2011 | |
Project: | Fabrication and Installation of GRE piping | |
Job Description | Fabrication and Installation of GRE piping for FSO Unity Oily Water Treatment | |
Client: | Ascot Africa Ltd | |
Year Completed: | 2011 | |
Project: | Supply of FMC Smith Meter | |
Project Description | Supply of FMC Smith Meter Model: LE3-S3(Standard Trim), Smith Meter Model: LE3-S3(Standard Trim) Master Meter, Accuracy Curve (5 point Flow Test) for Master Meter. (on standard factory test fluid) and Smith Meter In-line Strainers. | |
Client: | ExproTech | |
Year Completed: | 2011 | |
Project: | UT, Blasting and Painting of Trinity FPSO | |
Job Description | Scaffolding, blasting, and painting of all structures, vessels (seperators), piping and manifold on top of the production deck, Cellar deck, skimmer dect and painting at thye boat landing area on Trinity FPSO. | |
Client: | Shebah Exploration & Production Company Ltd | |
Year Completed: | 2011 | |
Project: | Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps | |
Project Description | General maintenance of the pumps which include activities like striping of the pumps, inspecting the parts to identify the bad spares and non reusable spares such as O’ Rings, rings etc, for replacement. General cleaning and servicing of the Sundyne pump (1-P-2511A, 2-P-1580B & 3-P-1580B) | |
Client: | NLNG | |
Year Completed: | 2011 | |
Project: | Engineering Requisition for Asset Tracking Systems UHF Receiver &Transponders | |
Project Description: | Supply of 4 Uhf Asset Tracking System Seetrac Base Unit (Sbu-Mil/G/S) Tt108/S/K, Including High Gain Antenna (Ttag05), Installation Kit Sbu-Ik 3 And 25uhf Asset Tracking System Seetrac Tender Unit (Stu) Tt101/K Including Ttag05 High Gain Antenna, Tts06 Panic Rocker Switch And Installation Kit Stu-Ik 1. | |
Client: | Delta Afrik Engineering Ltd. | |
Year Completed: | 2011 | |
Project: | Supply of Valve (Breda) | |
Project Description | Supply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type. | |
Client: | Agip | |
Year Completed: | 2011 | |
Project: | Supply of Milton Roy Chemical Injection package | |
Project Description | Chemical Dossing package including factory test & Special tool (Changing Kit for Damper) Engineer, manufacture and assemble in accordance with Company’s project specification. | |
Client: | Chevron | |
Year Completed: | 2011 | |
Project: | 5 Year Preventive and Corrective Maintenance of Loading Arms at NLNG Jetty. | |
Project Description | Removal, Overhaul, Repair and Reinstallation of Jetty 1 FMC Loading arms and facilities for NLNG on Bonny Island. | |
Client: | NLNG | |
Year Completed: | 2011 | |
Project: | Repair of Milton Roy Duplex pump on Cawthorne Channel | |
Project Description | Complete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Installation of GRE Earthing Saddles on GN Platform | |
Job Description | Onshore fabrication and offshore installation, Testing/Commissioning of 2″ 3″ and 4″ fiberglass piping on Mobil GN platform (Additional work on ECIP) | |
Client: | Subsea7 / Globestar | |
Year Completed: | 2011 | |
Project: | Repair of GRE Fire water network | |
Job Description | Fabrication, Installation and Repair of 20″ GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20″ carbon steel and 20′ GRFP line to bellow. Commission and testing of newly installed 20″ GRFP fire water line and casting of proper placement of Neoprene to avoid crack during line movement | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | Repair of Rapture 2″ x 16″ Saddle Reducer & 6″ FRP Flange | |
Job Description | Repair, Cutting, bonding laminating curing, and installation of 2″ X 6″ FRP flange for sand filter Backwash system, Adjustment of a 4″ FRP spool to accommodate a spacer ring and fixing of 2, 30″ FRP Saddle Reducer 6″ FRP Flange on Akpo FPSO | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | Supply of Casing | |
Job Description | Supply of size 9-5/8″, 7″ 4-1/2″ van top Casing | |
Client: | Seplat | |
Year Completed: | 2011 | |
Project: | Supply of Sundyne Gear Box | |
Job Description | Supply of new gear box, 311 Gear Box – 311, S/N 97117228/29 Sundyne Gear Box | |
Client: | NLNG | |
Year Completed: | 2011 | |
Project: | GRE Repairs GRE Repairs on Ebok MOPU Injection Line | |
Job Description | GRE Repairs on Ebok Mobil Offshore Production Unit Injection Line | |
Client: | Ivorene / Afren | |
Year Completed: | 2011 | |
Project: | OML-99 GRE Reapir works on Amenam | |
Project Description | Repair of cracked 16″ GRE Fire water pump B at AMP2, Reinfocement of 2 Nos10″Fire hydratant line at AMP 2, Replacement of 2″X28″ GRE Red sad for cooling system at AMP2, Fabrication of 4″ GRE flanged Spool, and fabrication of a 4″ GRE vent Droplet down to the grating. | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | EAP GN 4th Compressor – Installation of Fiberglass piping on GN Platform | |
Project description | Onshore fabrication and offshore installation, Testing/Commissioning of 2″ 3″ and 4″ fiberglass piping on Mobil GN platform (Additional work on ECIP) | |
Client: | Subsea 7 / Globestar | |
Year Completed: | 2011 | |
Project: | Repair of MULA Arms 1, 2 and 4 of NACJ | |
Job Description | Scaffolding, Weld-repair of defect on MULA 1, Addition of 8 brackets (stiffeners) on MULA 2 and 4 as a preventive action, Carry out Non-Destructive Test (NDT) on weldments, Blast-cleaning of effected areas and coating with anti-corrosion paint. | |
Client: | Julius Berger Nigeria Ltd | |
Year Completed: | 2011 | |
Project: | Repairs on GRE 4″ Hydrant Crank | |
Job Description | Repair and maintenance work on pump A, GRE 4″ Hydrant crack | |
Client: | Total Akpo | |
Year Completed: | 2011 | |
Project: | Repair of 2Nos Starter Motors | |
Job Description | Dismantling of the Starter Motor, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the the 2Nos Starter Motors. | |
Client: | Japaul | |
Year Completed: | 2011 | |
Project: | Repair of SP375 Ingersoll Rand Compressor | |
Job Description | Repair of SP375 Ingersoll Rand Compressor, dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor. | |
Client: | Nestoil Group | |
Year Completed: | 2011 | |
Project: | Supply of OCTG | |
Job Description | Supply of 36″ API SL, X-56, PSL-2 Conductor pipe (OCTG) | |
Client: | Addax Petroleum | |
Year Completed: | 2011 | |
Project: | GRE repairs on Akpo FPSO | |
Job Description | Fabrication, Installation, Repair, and Testing of 6″ & 3″ GRE firewater line for Akpo FPSO | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | GRE Pipe System Maintenance Services | |
Job Description | Fabrication, Installation and Maintenance of Ameron GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Agbami FPSO | |
Client: | Chevron | |
Year Completed: | 2011 | |
Project: | Repair of Firewater Pump | |
Job Description | Repair, Installation and testing of leaking AMP2 Firewater Pump A&B 8in discharge line at OML – 99 Amenam FPSO | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | Supply of Ingersoll Rand Cylinder | |
Job Description | Supply of 94 Gasket Valve Seat, 76 Capscrew 28, 56 Valve Check, 48 Cotter Pin 5, 44 Ring,Oli Scapper 9, 43 Retainer Valve 9, 33 Gasket Valve Seat 9, 34 Valve Retainer and 27 Pump Assembly Lubricating Oil Bushing, Ingersoll Rand Compressor Cylinder Spares | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of FMC Loading Arms | |
Project Description | Supply of Loading arms spares which includes Valve Pressure relief, Seal 125-108 20/40, MOCBague De Packing 16″ Secon Cryo, Valve Solenoid, 2POS, Eex “D”, etc. This was used for the Overhaul Spares for the 3 NLNG Marine Loading Arms | |
Client: | NLNG | |
Year Completed: | 2011 | |
Project: | Specialist Services on Dynamic Fiscalization System in SPDC Forcados Terminal | |
Project Description | Specialist services of 24″-ASTM API-5L X60, SCH 60,PSL2 pipes on Dynamic Fiscalization System in SPDC Forcados Terminal. | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of FMC Kits | |
Job Description | Supply of FMC PMS for 7 Arms, Stainless Steel Ice Net FOR 4 LNG MLA, Kit of hydraulic & electric for 2 condensate loading arms, 1 set 25T a frame for backward 25 T H 2250mm, 2 frames forward 25 T H 1900mm with HEM etc. For Upgrade of Electrical control system on Jetty 1 DRC 8734. | |
Client: | NLNG | |
Year Completed: | 2011 | |
Project: | Supply of Shim Crosshead Shoe | |
Project Description | Supply of 5 Random Length of 36 to 40 feet and manufactured to ASME B36.10 | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of Ingersoll Rand Con Rod Kit | |
Project Description | Supply of Ingersoll Rand 30 10T Safety Valve, 60 Assy Valve, 70 Con Rod Kit, 80 30-15T Seal Oil, 90 Level Switches, 110 Brg/Conn Rod Kit, 120 Thrust Pin, Crankcase, Centrifugal Unloaded & Pilot Valvea | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Procument of Dosing Pump and Flowmeter | |
Job Description | Procument, Installation and Commissioning of Dosing Pump and Flowmeter on Hypochlorite line at Erha | |
Client: | Exxonmobil | |
Year Completed: | 2011 | |
Project: | Supply of Flanges | |
Job Description | Supply of 7 24″ flange, 10 20″ flange, 12 20″flange, 16″flange, 2 12″ flange,1 10″ flange, 30 2″ flange, 9 2″ flange, 3 16″ x 20″ eccentric reducer same thickness as pipe, rectangular bar ,1’ x 1/4″,astm a36(18 to 20 ft), 1 plate 3/8″astm a36 (5ft x 20ft), wide flange beam w16 x 40 astm a36 20ft, 28″ flange wn 900# rtj, 24″ flange wn 900# rtj, etc | |
Client: | Exxonmobil | |
Year Completed: | 2011 | |
Project: | Supply of Line Pipes | |
Project Description | Supply Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M, 24″-ASTM API-5L X60, SCH 60,PSL2, double random length of 36 to 40 feet and manufactured to ASME B36.10 M. services | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | Grit blasting and painting of Ebugu platform | |
Project Description | Grit blasting and painting of all pipe work and associated support of the topsides and jackets of Ebugu platform OML 123 | |
Client: | Addax Petroleum | |
Year Completed: | 2011 | |
Project: | GRE Repair on OML58 | |
Job Description | Fabrication, Installation, Repair and Testing of 6″ GRE line on OML58 at Obite | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | Provision of Specialist Support Sevices for SPDC Metering Department | |
Project Description | Provision of Specialist Support Sevices which includes mob and demob, specialist support, periodic maintenance checks, and reporting for SPDC Metering Department. | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Fabrication, Installation and Repair of Raptureed 12″ & 20″ GRFP Fire Water Line | |
Job Description | Fabrication of spool and fittings, cutting of 20″ line damaged section, Bonding of 2, 20″ elbow and flange by fit and reinforced laminations and Mechanical coupling of flanged ends of 20″ carbon steel and 20″ GRFP Fire Water Line | |
Client: | WRPC | |
Year Completed: | 2011 | |
Project: | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells | |
Job Description | Multiphase Well Testing of: EBEGORO2T,ALS2T, OBF35LS, OBF36T, OBF37LS, OSHIE8SS, OLEH1LS | |
Client: | Agip | |
Year Completed: | 2011 | |
Project: | Provision of Multi-phase flowmeter for ETISONG NORTH 1 | |
Job Description | Provision of Multi-phase flowmeter for ETISONG NORTH 1 Exploratory well test campaign | |
Client: | Total / ExproTech | |
Year Completed: | 2011 | |
Project: | Supply of Pipe and Tubings | |
Project Description | 18″-API 5L X65 Seamless BE, SCH. 60 Carbon Steel pipes, 12″-ASTM A 333/A 333M B Gr 6 Seamless BE, SCH 120 Carbon Stee pipes, 8″-ASTM A 333/A 3, 4″ and 18″ x 12″ Red Bar Tee SCH. 60 Butt Weld, ASTM A860, GR. WPHY 65 SMLS same thickness as pipe services hydrocarbon. | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | GRE repairs on Akpo FPSO | |
Job Description | Repair of 6″, 8″ & 16″ GRE line & Sand filter on Akpo FPSO | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | GRE repairs on Erha FPSO | |
Job Description | Repair of 20″ and 40″ GRE line on Fire Water Network Erha FPSO | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | GRE repairs on Firewater networks | |
Job Description | Fabrication, Installation and Repair of 20″ GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20″ carbon steel and 20′ GRFP line to bellow. Commission and testing of newly installed 20″ GRFP fire water line and casting of proper placement of Neoprene to avoid crack during line movement | |
Client: | WRPC | |
Year Completed: | 2011 | |
Project: | Damaged GRE Fire Water Line Repairs | |
Job Description | Fabrication, Installation and Repair of GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20′ GRFP line to bellow. Commission and testing of newly installed GRFP fire water lines. | |
Client: | ExxonMobil (EDOP) | |
Year Completed: | 2011 | |
Project: | Repair & return of Sundyne Compressor Gear Box | |
Project Description | Dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. – Agbami | |
Client: | Chevron | |
Year Completed: | 2011 | |
Project: | Supply of Cameras | |
Project Description | Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras | |
Client: | Delta Afrik Engineering Ltd. | |
Year Completed: | 2011 | |
Project: | Repair of Compressor for energy works Technology limited | |
Job Description | Repair of 750 Compressor for energy works Technology limited | |
Client: | Nestoil Group | |
Year Completed: | 2011 | |
Project: | Supply of Milton Roy Parts | |
Project Description | Frame agreement for supply of Milton Roy products & spare parts (NG01010147) | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of Ingersoll Rand Parts | |
Project Description | Frame agreement for supply of Ingersoll Rand spare parts (East and West: NG01010099 & NG01010100) | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of Ingersoll Rand Compressor Spares | |
Job Description | Supply, Installation, Commissioning/Testing of Ingersoll Rand Compressor Spares | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of OMB Valves | |
Job Description | Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2) | |
Client: | Exxonmobil | |
Year Completed: | 2011 | |
Project: | Fabrication and installation of GRE pipes | |
Project Description | Fabrication and installation of GRE spool pipes (Delta South) | |
Client: | Chevron | |
Year Completed: | 2011 | |
Project: | Supply of Ingersoll Rand Valve | |
Job Description | Supply of 19 Element Filter Air, 27 Unloader Valve Ingersoll Rand Valve | |
Client: | Shell | |
Year Completed: | 2011 | |
Project: | Supply of Line Pipes | |
Job Description | Supply of Line 4″, 16″ & 24″-ASTM API-5L X60, SCH 60,PSL2, double random length of 36 to 40 feet and manufactured to ASME B36.10 M – line pipes | |
Client: | Addax Petroleum | |
Year Completed: | 2011 | |
Project: | Repair of Ruptured Downstream Line | |
Job Description | Repair of ruptured 3″ x 6″ line Downstream 46PSV 7311-A at AMP2 (OML 99) Amenam | |
Client: | Total | |
Year Completed: | 2011 | |
Project: | Supply of Cylinder (FMC) | |
Job Description | Supply of Cylinder, Hydraulic, 125×45-62, Slew, 105bar. Mfg Fmc Technologies, P/N 241100301604023, Drawno 241100390270, Item 408. 6 Cylinder, Hydraulic,140x145c1000,Outboard, Valve, Double, Throttle, Type Aron | |
Client: | Exxonmobil | |
Year Completed: | 2011 | |
Project: | Kizombe FPSO GRE pipe network site survey | |
Project Description | Fabrication, Installation and Maintenance of GRE/ GRP Pipes and Fittings for Esso Exploration Kizombe FPSO projects | |
Client: | Esso Angola | |
Year Completed: | 2011 | |
Project: | BRT Laoding Arms Repairs | |
Project Description | BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | Repair OF GRE pipes for Interplant corridor projectOML-99 | |
Project Description | Supply, Fabrication & Installation of GRE/Line pipes for interplant corridor project | |
Client: | Chevron | |
Year Completed: | 2011 | |
Project: | Supply of OMB Products | |
Project Description | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Supply of OMB Products | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | Supply of Electroswitch Materials | |
Project Description | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Electroswitch Materials | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | Supply of Cummins Materials | |
Project Description | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Cummins Materials | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | Supply of Parker Instrumentation Products. | |
Project Description | Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Parker Instrumentation Products. | |
Client: | ExxonMobil | |
Year Completed: | 2011 | |
Project: | GRE Piping/Support on Agbami FPSO | |
Project Description | GRE Piping/Support on Agbami FPSO | |
Client: | Chevron |