Year Completed:2012
Project:Repair of GRE Pipework on AKPO FPSO (Original & 2nd Scope)
Project descriptionReplacement/Correction Of Faulty Parts & Maintenance Of The Akpo FPSO
Client:Total
Year Completed:2012
Project:BRT Laoding Arms Pre-revamp Assessment
Project descriptionInspection and repair of swivel joints, panthograph & drive wire ropes, couplers, valves and emergency release systems (ESD 1 & 2), hydraulic drive system, electrical control system for evidence of damage, leakage, corrosion or excessive wear and other details to effect a flawless revamp of all the loading arms in the MPN Loading Jetty.
Client:ExxonMobil
Year Completed:2012
Project:Kizombe FPSO GRE pipe network site survey
Project DescriptionFabrication, Installation and Maintenance of GRE/ GRP Pipes and Fittings for Esso Exploration Kizombe FPSO projects
Client:Esso Angola
Year Completed:2012
Project:Supply Of Sundyne GB Kit & Exchange Gear Box
Project descriptionSuppy Housing gasket, Seal rotating face, Bearings, Shaft Assy, Exchange gear box + mechanical seal
Client:Chevron
Year Completed:2012
Project:Supply of Milton Roy Chemical Injection package
Project DescriptionChemical Dossing package including factory test & Special tool (Changing Kit for Damper) Engineer, manufacture and assemble in accordance with Company’s project specification.
Client:Chevron
Year Completed:2012
Project:Supply Of FMC Spares
Supply of PMS for 7 Arms (4 LNG and 3 Condensate), Siemens Cabinet (with cables & accessories), 4 Stainless Steel ice net for 4 LNG MLA, Kit of hydraulic & electric for 2 Condensate loading arms, Set 25T A frame for LNG MLA, Dummy riser for LNG, Initial spares for electrical control system upgrade & Jetty control panel.
Client:NLNG
Year Completed:2012
Project:Repair of Milton Roy Duplex pump on Cawthorne Channel
Project DescriptionComplete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump
Client:Total
Year Completed:2012
Project:Supply of Valve (Breda)
Project DescriptionSupply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type.
Client:Agip
Year Completed:2012
Project:Supply Of Parker Fittings
Project descriptionSupply of 20 Fitting, Hose, Male, 9/16″ 18 Tpi Jic Rigid, 50 Fitting, Hose, Male, 16″Tpi Jic Rigid, 50 Fitting, Hose, Male, 20″Tpi Jic Rigid, 50 Fitting, Hose, Male, 20″Tpi Jic Rigid, 50 Fitting, Hose, Male, 12″Tpi Jic Rigid,  10 Fitting, Hose, Male, 1-5/16″Tpi Jic Rigid, 50 Each Fitting, Hose, Male, 20″Tpi Jic Rigid, 50 Each Fitting, Hose, Male, 20″Tpi Jic Rigid. (Parker)
Client:ExxonMobil
Year Completed:2012
Project:Supply of FMC Loading Arms
Project DescriptionSupply of Loading arms spares which includes Valve Pressure relief, Seal 125-108 20/40, MOCBague De Packing 16″ Secon Cryo, Valve Solenoid, 2POS, Eex “D”, etc. This was used for the Overhaul Spares for the 3 NLNG Marine Loading Arms
Client:NLNG
Year Completed:2012
Project:Supply of Milton Roy Spares
Project descriptionSupply of Dosing Pump Without Motor XA BP, Servomotor with card electronic S12, Complete dosing pump without motor L – S, Chemical pump with electrical motor (Milton Roy Spares)
Client:Total
Year Completed:2012
Project:OML-99 GRE Repair Works
Project descriptionRepair, Installation and testing of leaking AMP2 Firewater Pump A&B 8in discharge line at OML – 99 Amenam FPSO
Client:Total
Year Completed:2012
Project:FPSO Kwamah Nkrumeh GRE Works
Project descriptionFabrication, Installation and Maintenance of GRE Pipes and Fittings for Kwamah Nkrumeh FPSO Ghana
Client:Modec Ghana Ltd
Year Completed:2012
Project:Repair Of Agbami Sea Water Lift 20″ Pipe
Project descriptionRepair of 20″ X 16″, 12″ X 10″ and lower diameters GRP lines on Firewater network
Client:Chevron
Year Completed:2012
Project:Repair & return of Sundyne Compressor Gear Box
Project DescriptionDismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box.
Client:Chevron
Year Completed:2012
Project:Supply of Conical Strainer (AVSCO)
Project DescriptionSupply of 6″ Avsco Conical Stranner for Compressor (Centrifugal)
Client:Amec Contractors (WA) Limited
Year Completed:2012
Project:Supply of Ingersoll Rand Con Rod Kit
Project DescriptionSupply of Ingersoll Rand 30 10T Safety Valve, 60 Assy Valve, 70 Con Rod Kit, 80 30-15T Seal Oil, 90 Level Switches, 110 Brg/Conn Rod Kit, 120 Thrust Pin, Crankcase, Centrifugal Unloaded & Pilot Valvea
Client:Shell
Year Completed:2012
Project:Supply of Line Pipes
Project DescriptionSupply Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M, 24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M. services
Client:ExxonMobil
Year Completed:2012
Project:Supply of OMB Ball Valves
Project DescriptionBall Ball 1″ 1500lb, PE Floating, OMB TA-905-SW+2NP. XXS+LD. A105N/316L/Delrin OMB, Valve, Gloge, 3/4IN, 1500LB, OMB.
Client:ExxonMobil
Year Completed:2012
Project:OML-99 GRE Reapir works on Amenam
Project DescriptionRepair of cracked 16″ GRE Fire water pump B at AMP2, Reinfocement of 2 Nos10″Fire hydratant line at AMP 2, Replacement of 2″X28″ GRE Red sad for cooling system at AMP2, Fabrication of 4″ GRE flanged Spool, and fabrication of a 4″ GRE vent Droplet down to the grating.
Client:Total
Year Completed:2012
Project:Grit blasting and painting of Ebugu platform
Project DescriptionGrit blasting and painting of all pipe work and associated support of the topsides and jackets of Ebugu platform OML 123
Client:Addax
Year Completed:2012
Project:Supply of FMC Smith Meter
Project DescriptionSupply of FMC Smith Meter Model: LE3-S3(Standard Trim), Smith Meter Model: LE3-S3(Standard Trim) Master Meter, Accuracy Curve (5 point Flow Test) for Master Meter. (on standard factory test fluid) and Smith Meter In-line Strainers.
Client:ExproTech
Year Completed:2012
Project:Provision of Specialist Support Sevices for SPDC Metering Department
Project DescriptionProvision of Specialist Support Sevices which includes mob and demob, specialist support, periodic maintenance checks, and reporting for SPDC Metering Department.
Client:Shell
Year Completed:2012
Project:Specialist Services on Dynamic Fiscalization System in SPDC Forcados Terminal
Project DescriptionTop class performance of the Dynamic Metering System for Custody transfer of crude oil from the Forcados Terminal Operations for SPDC which include and not limited Specialist Support-Periodic Maintenance Checks, Optional Remote Diagnostic Support and Reporting.
Client:Shell
Year Completed:2012
Project:Provision of Multiphase flow meter
Project DescriptionProvision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells
Client:Total
Year Completed:2012
Project:Provision of Multi-phase flowmeter for Well Testing Campaign.
Project DescriptionProvision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells
Client:Agip
Year Completed:2012
Project:Preventive and Corrective Maintenance of Loading Arms at the the NLNG Jetty.
Project DescriptionRemoval, Overhaul, Repair and Reinstallation of Jetty 1 FMC Loading Arms and facilities for NLNG on Bonny Island.
Client:NLNG
Year Completed:2012
Project:Repair of Ingersoll Rand Compressor
Job DescriptionRepair and overhaul of XP 750 IngersollRand Compressor, including servicing of fuel injector of the compressor
Client:Japan International Company Agency (JICA)
Year Completed:2012
Project:Supply of Ingersoll Rand Compressor Spares
Job DescriptionRepair and overhaul of XP 750 IngersollRand Compressor
Client:Shell
Year Completed:2012
Project:Supply of Induction Bends
Job DescriptionSupply of 3d Bends, 90 Deg, API 5l X65. Sch 60 Thickness as Pipe Service – Hydrocarbon 18″ 90 Deg 3d Bend Induction, Sch 60
Client:ExxonMobil
Year Completed:2012
Project:Provision of Multiphase Well Testing
Job DescriptionProvision of Multiphase Well Testing for Land Swamp wells (Oben, Sapele etc)
Client:Seplat
Year Completed:2012
Project:Supply of R4 Class B AIS Transponder Kit
Job DescriptionSupply of R4 Class B Ais Transponder with Power/ Single Cable GPS antenna AC Marine (26dB) incl. 6m cable with mounted connector for antenna side and mounted transponder side connector.
Client:Delta Afrik
Year Completed:2012
Project:Repair of Firewater line
Job DescriptionRepair of 8″ & 10″ GRE Firewater line – Cutting, bonding, and curing of 8″ and 10″ FRP flange for the sand filter Backwash.
Client:Total
error: Content is protected !!