Year Completed: | | 2012 |
Project: | | Repair of GRE Pipework on AKPO FPSO (Original & 2nd Scope) |
Project description | | Replacement/Correction Of Faulty Parts & Maintenance Of The Akpo FPSO |
Client: | | Total |
| | |
Year Completed: | | 2012 |
Project: | | BRT Laoding Arms Pre-revamp Assessment |
Project description | | Inspection and repair of swivel joints, panthograph & drive wire ropes, couplers, valves and emergency release systems (ESD 1 & 2), hydraulic drive system, electrical control system for evidence of damage, leakage, corrosion or excessive wear and other details to effect a flawless revamp of all the loading arms in the MPN Loading Jetty. |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2012 |
Project: | | Kizombe FPSO GRE pipe network site survey |
Project Description | | Fabrication, Installation and Maintenance of GRE/ GRP Pipes and Fittings for Esso Exploration Kizombe FPSO projects |
Client: | | Esso Angola |
| | |
Year Completed: | | 2012 |
Project: | | Supply Of Sundyne GB Kit & Exchange Gear Box |
Project description | | Suppy Housing gasket, Seal rotating face, Bearings, Shaft Assy, Exchange gear box + mechanical seal |
Client: | | Chevron |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Milton Roy Chemical Injection package |
Project Description | | Chemical Dossing package including factory test & Special tool (Changing Kit for Damper) Engineer, manufacture and assemble in accordance with Company’s project specification. |
Client: | | Chevron |
| | |
Year Completed: | | 2012 |
Project: | | Supply Of FMC Spares |
| | Supply of PMS for 7 Arms (4 LNG and 3 Condensate), Siemens Cabinet (with cables & accessories), 4 Stainless Steel ice net for 4 LNG MLA, Kit of hydraulic & electric for 2 Condensate loading arms, Set 25T A frame for LNG MLA, Dummy riser for LNG, Initial spares for electrical control system upgrade & Jetty control panel. |
Client: | | NLNG |
| | |
Year Completed: | | 2012 |
Project: | | Repair of Milton Roy Duplex pump on Cawthorne Channel |
Project Description | | Complete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump |
Client: | | Total |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Valve (Breda) |
Project Description | | Supply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type. |
Client: | | Agip |
| | |
Year Completed: | | 2012 |
Project: | | Supply Of Parker Fittings |
Project description | | Supply of 20 Fitting, Hose, Male, 9/16″ 18 Tpi Jic Rigid, 50 Fitting, Hose, Male, 16″Tpi Jic Rigid, 50 Fitting, Hose, Male, 20″Tpi Jic Rigid, 50 Fitting, Hose, Male, 20″Tpi Jic Rigid, 50 Fitting, Hose, Male, 12″Tpi Jic Rigid, 10 Fitting, Hose, Male, 1-5/16″Tpi Jic Rigid, 50 Each Fitting, Hose, Male, 20″Tpi Jic Rigid, 50 Each Fitting, Hose, Male, 20″Tpi Jic Rigid. (Parker) |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2012 |
Project: | | Supply of FMC Loading Arms |
Project Description | | Supply of Loading arms spares which includes Valve Pressure relief, Seal 125-108 20/40, MOCBague De Packing 16″ Secon Cryo, Valve Solenoid, 2POS, Eex “D”, etc. This was used for the Overhaul Spares for the 3 NLNG Marine Loading Arms |
Client: | | NLNG |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Milton Roy Spares |
Project description | | Supply of Dosing Pump Without Motor XA BP, Servomotor with card electronic S12, Complete dosing pump without motor L – S, Chemical pump with electrical motor (Milton Roy Spares) |
Client: | | Total |
| | |
Year Completed: | | 2012 |
Project: | | OML-99 GRE Repair Works |
Project description | | Repair, Installation and testing of leaking AMP2 Firewater Pump A&B 8in discharge line at OML – 99 Amenam FPSO |
Client: | | Total |
| | |
Year Completed: | | 2012 |
Project: | | FPSO Kwamah Nkrumeh GRE Works |
Project description | | Fabrication, Installation and Maintenance of GRE Pipes and Fittings for Kwamah Nkrumeh FPSO Ghana |
Client: | | Modec Ghana Ltd |
| | |
Year Completed: | | 2012 |
Project: | | Repair Of Agbami Sea Water Lift 20″ Pipe |
Project description | | Repair of 20″ X 16″, 12″ X 10″ and lower diameters GRP lines on Firewater network |
Client: | | Chevron |
| | |
Year Completed: | | 2012 |
Project: | | Repair & return of Sundyne Compressor Gear Box |
Project Description | | Dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. |
Client: | | Chevron |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Conical Strainer (AVSCO) |
Project Description | | Supply of 6″ Avsco Conical Stranner for Compressor (Centrifugal) |
Client: | | Amec Contractors (WA) Limited |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Ingersoll Rand Con Rod Kit |
Project Description | | Supply of Ingersoll Rand 30 10T Safety Valve, 60 Assy Valve, 70 Con Rod Kit, 80 30-15T Seal Oil, 90 Level Switches, 110 Brg/Conn Rod Kit, 120 Thrust Pin, Crankcase, Centrifugal Unloaded & Pilot Valvea |
Client: | | Shell |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Line Pipes |
Project Description | | Supply Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M, 24″-ASTM API-5L X60, SCH 60,PSL2, double random length of 36 to 40 feet and manufactured to ASME B36.10 M. services |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2012 |
Project: | | Supply of OMB Ball Valves |
Project Description | | Ball Ball 1″ 1500lb, PE Floating, OMB TA-905-SW+2NP. XXS+LD. A105N/316L/Delrin OMB, Valve, Gloge, 3/4IN, 1500LB, OMB. |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2012 |
Project: | | OML-99 GRE Reapir works on Amenam |
Project Description | | Repair of cracked 16″ GRE Fire water pump B at AMP2, Reinfocement of 2 Nos10″Fire hydratant line at AMP 2, Replacement of 2″X28″ GRE Red sad for cooling system at AMP2, Fabrication of 4″ GRE flanged Spool, and fabrication of a 4″ GRE vent Droplet down to the grating. |
Client: | | Total |
| | |
Year Completed: | | 2012 |
Project: | | Grit blasting and painting of Ebugu platform |
Project Description | | Grit blasting and painting of all pipe work and associated support of the topsides and jackets of Ebugu platform OML 123 |
Client: | | Addax |
| | |
Year Completed: | | 2012 |
Project: | | Supply of FMC Smith Meter |
Project Description | | Supply of FMC Smith Meter Model: LE3-S3(Standard Trim), Smith Meter Model: LE3-S3(Standard Trim) Master Meter, Accuracy Curve (5 point Flow Test) for Master Meter. (on standard factory test fluid) and Smith Meter In-line Strainers. |
Client: | | ExproTech |
| | |
Year Completed: | | 2012 |
Project: | | Provision of Specialist Support Sevices for SPDC Metering Department |
Project Description | | Provision of Specialist Support Sevices which includes mob and demob, specialist support, periodic maintenance checks, and reporting for SPDC Metering Department. |
Client: | | Shell |
| | |
Year Completed: | | 2012 |
Project: | | Specialist Services on Dynamic Fiscalization System in SPDC Forcados Terminal |
Project Description | | Top class performance of the Dynamic Metering System for Custody transfer of crude oil from the Forcados Terminal Operations for SPDC which include and not limited Specialist Support-Periodic Maintenance Checks, Optional Remote Diagnostic Support and Reporting. |
Client: | | Shell |
| | |
Year Completed: | | 2012 |
Project: | | Provision of Multiphase flow meter |
Project Description | | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells |
Client: | | Total |
| | |
Year Completed: | | 2012 |
Project: | | Provision of Multi-phase flowmeter for Well Testing Campaign. |
Project Description | | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells |
Client: | | Agip |
| | |
Year Completed: | | 2012 |
Project: | | Preventive and Corrective Maintenance of Loading Arms at the the NLNG Jetty. |
Project Description | | Removal, Overhaul, Repair and Reinstallation of Jetty 1 FMC Loading Arms and facilities for NLNG on Bonny Island. |
Client: | | NLNG |
| | |
Year Completed: | | 2012 |
Project: | | Repair of Ingersoll Rand Compressor |
Job Description | | Repair and overhaul of XP 750 IngersollRand Compressor, including servicing of fuel injector of the compressor |
Client: | | Japan International Company Agency (JICA) |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Ingersoll Rand Compressor Spares |
Job Description | | Repair and overhaul of XP 750 IngersollRand Compressor |
Client: | | Shell |
| | |
Year Completed: | | 2012 |
Project: | | Supply of Induction Bends |
Job Description | | Supply of 3d Bends, 90 Deg, API 5l X65. Sch 60 Thickness as Pipe Service – Hydrocarbon 18″ 90 Deg 3d Bend Induction, Sch 60 |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2012 |
Project: | | Provision of Multiphase Well Testing |
Job Description | | Provision of Multiphase Well Testing for Land Swamp wells (Oben, Sapele etc) |
Client: | | Seplat |
| | |
Year Completed: | | 2012 |
Project: | | Supply of R4 Class B AIS Transponder Kit |
Job Description | | Supply of R4 Class B Ais Transponder with Power/ Single Cable GPS antenna AC Marine (26dB) incl. 6m cable with mounted connector for antenna side and mounted transponder side connector. |
Client: | | Delta Afrik |
| | |
Year Completed: | | 2012 |
Project: | | Repair of Firewater line |
Job Description | | Repair of 8″ & 10″ GRE Firewater line – Cutting, bonding, and curing of 8″ and 10″ FRP flange for the sand filter Backwash. |
Client: | | Total |