Year Completed: | | 2013 |
Project: | | Provision of Manpower Support Services |
Project description | | Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions |
Client: | | Chevron |
| | |
Year Completed: | | 2013 |
Project: | | Provision of Multiphase Flow Meter Well Testing Services |
Project description | | Provision of Multiphase Flow Meter Well Testing Services in Ovhor Field; Swamp Location |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2013 |
Project: | | Provision of Multiphase Flow Meter Well Testing in Okporhuru Field |
Project description | | Provision of Multiphase Flow Meter Well Testing in Okporhuru Field |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2013 |
Project: | | Provision Of MPFM Well Testing On Okpoho Platform |
Project description | | Provision of equipments and personnel for both Swamp Operation for MPFM Well Testing on Okpoho Platform. |
Client: | | NPDC/Halliburton |
| | |
Year Completed: | | 2013 |
Project: | | Supply and Installation of Sunstrand Gear Box Assembly |
Project description | | Supply and Installation of 1 Sunstrand Gear box assembly (model: LMV-331), input/output RPM 2960/15232, pump S/N: D-99118144/45 |
Client: | | NLNG |
| | |
Year Completed: | | 2013 |
Project: | | Repair of GRE Lines |
Project description | | Repair of 3″ GRE Line on Total Akpo FPSO |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Chemical Injection Skid Rental |
Project description | | Temporary installation of two chlorination (chemical Injections skid) units |
Client: | | Total (ODP/OFON) |
| | |
Year Completed: | | 2013 |
Project: | | Repair of GRE Lines |
Project description | | AMD2 Repair of 3″ GRE Line on Total Amenam |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Fabrication & Installation Of GRE Piping On Delta South Quarters (DSQ) |
Project description | | Provision of Personnel and Tools for the Fabrication & Installation of GRE Piping on Delta South Quarters |
Client: | | Aveon / Chevron |
| | |
Year Completed: | | 2013 |
Project: | | Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps |
Project Description | | General maintenance of the pumps which include activities like striping of the pumps, inspecting the parts to identify the bad spares and non reusable spares such as O’ Rings, rings etc, for replacement. |
Client: | | NLNG |
| | |
Year Completed: | | 2013 |
Project: | | Design, Manufacture and Supply of Atlas COPCO Complete Pressure Safety Valve and Complete low pressure service stage |
Project description | | Design, Manufacture and Supply of 2 Atlas COPCO Complete Pressure Safety Valves (1″1/2 Gas, 3.7 Bar) and 2 Complete of low pressure service stages with epoxy coated screws for Atlas COPCO ZR425X-10.5 50Hz Air Compressor |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Supply and installation of Atlas Copco Safety Valve For Akpo Project |
Project description | | Supply of 2 complete Pressure Safety Valve of 1″ 1/2 gas, 3.7 bar brass and 2 complete low pressure service stage with Epoxy coated screw for Atlas Copco 5OHZ Air Compressor |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Design, Manufacture and Supply Of Fuel Gas Package |
Project description | | Design, Manufacture and Supply of Fuel gas knock out drum, Fuel gas heater and Fuel gas filter of 1 X 100% configuration, 1.5 mmscfs, 3.5 weight |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of Casing |
Project description | | Supply of 1250 joints of 13-3/8″ N80, BTC R3 CASING with non bevelled couplings Casings |
Client: | | Addax |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of OMB Ball Valve |
Project description | | Supply of 10 Full Bore Forged Steel Cl 600 Raised Face OMB Ball Valve BSE600RF-MTL-GO-20″,FB AND Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2) OMB valves for Shell Valve replacement Project. |
Client: | | Shell |
| | |
Year Completed: | | 2013 |
Project: | | Repair of 12″ & 4″ GRE Firewater line |
Project description: | | Fabrication, Installation and Maintenance of NOV GRE 12″ X 4″ pipes and fittings and lower diameters GRP lines on Firewater network on WRPC platform |
Client: | | WRPC |
| | |
Year Completed: | | 2013 |
Project: | | Repair of 8”, 12” and CWC Overboard GRE Pipes |
Project description | | Repair, Fabrication and Installation of 8”, 12” and 14″ CWC Overboard GRE pipes on Agbami FPSO |
Client: | | Chevron |
| | |
Year Completed: | | 2013 |
Project: | | Operation & Maintenance Of NACJ – Marine Unloading Arm Package |
Project Description | | Operation & Maintenance of Loading Arms: 24-hour Operation, monitoring, repair & maintenance of 4 Loading Arms for loading and offloading of petroleum products at the New Atlas Cove Jetty; Stocking of spares for Maintenance Services. |
Client: | | Julius Berger Nigeria Ltd |
| | |
Year Completed: | | 2013 |
Project: | | Provision Of MultiPhase Well Testing For Land & Swamp Operations |
Project description | | Provision of personnel and Equipments for MultiPhase Well Testing For Land & Swamp wells in Oben, Sapele Field (OML 4, 38 & 41) |
Client: | | Seplat |
| | |
Year Completed: | | 2013 |
Project: | | Removal, Overhaul, Repair & Installation of Jetty 1 FMC Loading Arm & Facilities |
Project description | | Removal, overhaul, and reinstatement of Marine loading Arms for LNG and Condensate, replacement and upgrade of the electrical control systems, replacement of the hydraulic control systems and like for like parts as per recommendation of OEM. |
Client: | | NLNG |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of Casing |
Project description | | Supply of 1500 joints of 13-3/8″ N80, BTC R3 CASING with bevelled couplings Casings AND Supply Of Casing: 36X1.5 WT X-52/6XL-5 R3 Conductor Pipe XLC-S Connection or Frank DDC Connection |
Client: | | Addax |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of Tubing |
Project description | | Supply of 2 – 7/8″ 6.5 – P-110 RTS-8, X-over 3 – 1/2″ 9.3 – P-110 RTS-8, and 6 – 1/2″ 12.7 13CR-110 KSBEAR Tubings to NAOC Port Harcourt |
Client: | | Agip |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of Milton Roy Chemical Injection Skid |
Project description | | Rental of Milton Roy Chemical Injection skid & Electronic metering pump with storage tank for Total ODP/OFON Odudu Project |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | BRT Laoding Arms Repairs |
Project Description | | BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms |
Client: | | ExxonMobil |
| | |
Year Completed: | | 2013 |
Project: | | Provision Air Winches Rental |
Project description | | Provision of 1 unit of 825 cfm Ingersoll Rand compressor with skid, 2 units of 10 ton air winch with 300 meter 22mm sling, 30/40 meters 1# air hose |
Client: | | Saipem |
| | |
Year Completed: | | 2013 |
Project: | | Supply of Non-Stabilized PTZ Cameras |
Project Description | | Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras |
Client: | | Delta Afrik |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of Milton Roy Chemical Injection Duplex Pump |
Project description | | Supply, Installation and Commission of 3 Stainless Steel Chemical Injection Duplex Pump 100 |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Supply of Sundyne Compressor LMC 333 & Spare Parts on Agbami FPSO |
Project description | | Supply of Sundyne Diffuser, Nut Impeller, Impeller Spacer, Thruttle Bushing & Lip double Seal & Reverse Pressure Seal for Minox Comprssor C-417700 C-417800 C-418700 C418800 Sundyne Compressor LMC 333 on Agbami FPSO |
Client: | | Chevron |
| | |
Year Completed: | | 2013 |
Project: | | Supply of Seamless Carbon Steel Pipe |
Project description | | Supply of 60 joints of 2″-Sch Pipe Seamless , 24 3″-Sch Seamless Pipe, 184 4″-Sch Seamless Pipe, 36 2″ – Sch Fine Grain.Cs Seamless Pipe, 24 3″ – Sch Fine Grain.Cs Seamless Pipe, 36 6″ Sch Cs Seamless Pipe |
Client: | | Saipem |
| | |
Year Completed: | | 2013 |
Project: | | GRE Piping Repair Of Fire Water System |
Project description: | | Fabrication, Installation and Maintenance of NOV GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Usan FPSO |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Provision Of Surface Well Testing Service On |
Project description | | Provision of complete surface test equipment consisting of choke/test manifolds, vessels, valves, flow lines, burners, pumps, pressure, temperature and flow rate measurement, lab facilities and Provision of service technicians for running, servicing, testing etc, field reports, preliminary gauge data analysis and any other service required to ensure an efficient operation |
Client: | | Sterling Energy & Exploration Production Limited |
| | |
Year Completed: | | 2013 |
Project: | | Repair of 12″ & 4″ GRE Firewater line |
Project description: | | Fabrication, Installation and Maintenance of NOV GRE 12″ X 4″ pipes and fittings and lower diameters GRP lines on Firewater network on WRPC platform |
Client: | | WRPC |
| | |
Year Completed: | | 2013 |
Project: | | Supply, Installation and Commissioning of Milton Roy Dulex Pump |
Project description | | Supply of 1.5kw Chemical injection pump, 3 0.55kw Duplex chemical injection pump, 2 0.37kw Duplex chemical injection pump of 1500RPM, 50Hz, 240 – 420V with electrical motor (Milton Roy) |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Supply, Installation and Commissioning Of Plant Air Package |
Project description | | Supply, Installation and Commissioning of plant air knock out drum, plant air heater and plant air filter of 1 X 100% configuration, 1.5 mmscfs, 3.5 weight |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2013 |
Project: | | Repair of GRE Pipework on AKPO FPSO (3rd Scope) |
Project description | | Replacement/Correction Of Faulty Parts & Maintenance Of The Akpo FPSO |
Client: | | Total |
| | |
Year Completed: | | 2013 |
Project: | | Repair Of 12″ Ballast Line On Warrior Vessel |
Project description | | Fabrication, Installation and Repair of NOV 12″ Ballat lower diameters lines Warrior FPSO |
Client: | | Warrior Nassau |
| | |
Year Completed: | | 2013 |
Project: | | Supply Of Casing |
Project description | | Supply of 12,000 ft of 13 – 3/8″, K55, 68 LB/FT BTC Casings (Seplat Ogunu Warehouse). |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2013 |
Project: | | Provision Of MultiPhase Well Testing For Land & Swamp Operations |
Project description | | Provision of personnel and Equipments for MultiPhase Well Testing campaign in Land & Swamp wells. |
Client: | | Agip |
| | |
Year Completed: | | 2013 |
Project: | | Repair of Milton Roy Duplex pump on Cawthorne Channel |
Project Description | | Complete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump |
Client: | | Total |