Year Completed: | | 2014 |
Project: | | Provision of Manpower Support Services |
Project description | | Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions |
Client: | | Chevron |
| | |
Year Completed: | | 2014 |
Project: | | Design, Manufacture and Supply Of Chemical Injection Package For OFD3 & OFD5 Ofon Project |
Project description | | Design, Manufacture and Supply and installation of 2 Chemical injection skid with double diaphragm pumps for OFD3 & OFD5, Automated stroke adjustment with ECC actuators (exproof) signal 4-20m. |
Client: | | Nigerdock/Total |
| | |
Year Completed: | | 2014 |
Project: | | Supply Of Portable Methanol Injection Skid For OFD3 & OFD5 Ofon Project |
Project description | | Supply and inspection of 2 Portable Methanol Injection skid with double diaphragm pumps with local detector for OFD3 & OFD5, lifting beam with slings and saddles, |
Client: | | Nigerdock/Total |
| | |
Year Completed: | | 2014 |
Project: | | ERHA North Phase 2 Project |
Project description | | Supply of Seamless Cladded and non Cladded Line Pipes, ranging from 6″ to 12″ of about 5,149 MT in weight |
Client: | | Subsea 7 |
| | |
Year Completed: | | 2014 |
Project: | | Supply Of Casing |
Project description | | Supply of 5715 Pieces of Joint Casing at 40ft/joint, 9-5/8″, 47Lb/Ft, BTC, R3 of approx. 4,840MT |
Client: | | Addax |
| | |
Year Completed: | | 2014 |
Project: | | Supply of 36,000 FT Casing |
Project description | | Three phase Supply of Casing, 9-5/8″, 47PPF, 13CrL80, JFE Bear Pin x Box Connections of 780MT |
Client: | | Afren |
| | |
Year Completed: | | 2014 |
Project: | | Provision of Welltesting Services |
Project description | | Provision of Multiphase flow meter well testing services for Ovhor Well |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Gate Valves as requested by Terminal Operations |
Project description | | Supply of 2 M&J RQ-8 Slab Gate Valves 30″ and 2 M&J RQ-8 Slab Gate Valves 36″ |
Client: | | Chevron |
| | |
Year Completed: | | 2014 |
Project: | | Engineering, Procurement, Construction and Commissioning for GRP & PVDF Piping for OFD3 & OFD5 Platforms and Access Bridges |
Project description | | Provision of Elbows (45/90 TF) ranging in size from 2″ to 6″, Coupling, Tees, Flanges, Pipes (by MT TMXTF 3.6mm 3.9mm and 4.6mm, 306 Meters) ranging in size from 2″ to 6″ |
Client: | | Nigerdock |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Deliverables for Mobil Offshore Security Upgrades Project |
Project description | | Supply of Software; Provision of Operation, Installation and Maintenance Procedures; Pre-Commissioning Procedures; Commissioning Start-up, Turnover and Completion Procedures; and Preparation of Training Operation and Maintenance Manuals. |
Client: | | Delta Afrik |
| | |
Year Completed: | | 2014 |
Project: | | Provision of Seismic Supervision Services |
Project description | | Provision of Seismic Supervision Services (Contractor Junior H3SE Trainee Supervisor) for USAN 4D Monitor 2 Survey (OML 138) |
Client: | | Total |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Materials for Minox Pressure Control Valve Change Out Project on Agbami FPSO |
Project description | | Supply of 30 materials including 12″, 14″ and 20″ pipes, ball valves and full face gaskets for Minox Pressure Control Valve Change Out Project on Agbami FPSO |
Client: | | Chevron |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Milton Roy Parts & Spare Part |
Project Description | | Frame agreement for supply of Milton Roy products & spare parts (NG01010147) |
Client: | | Shell |
| | |
Year Completed: | | 2014 |
Project: | | Design, Manufacture and Supply Of Meren Water Injection Platform (MWIP) ElectroChlorinated Package |
Project description | | Design, Manufacture and Supply of skid-mounted PEPCON ChlorMaster 2 x CM-S-2(BP) Sodium Hypochlorite Generation System package. The package consist of 2 x 100% Hypochlorite Generators, each with a generating capacity of up to 16 lb/hr chlorine equivalent as NaOCl. ElectroChlorinated Package |
Client: | | Chevron |
| | |
Year Completed: | | 2014 |
Project: | | GRE Pipe System Maintenance Services |
Project description | | Fabrication, Installation and Maintenance of NOV GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Agbami FPSO |
Client: | | Chevron |
| | |
Year Completed: | | 2014 |
Project: | | Fabrication and Installation of FRP, HDPE & CPVC Pipeline at Escravos |
Project description | | Excavation, Painting, Cutting, Shaping, Joining, Clamping, Padding and Laying of the following lines: 3″ SE-A50-6007, 4″ SE-A19-6007, 6″ WP-A50-6112, 12″ W-B50-6129 and Hydro-testing. |
Client: | | Idmon Engineering & Contruction |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Calcium Hypo chloride Milton Roy Pump & Ferric Sulfate Milton Roy Pump |
Project description | | Supply of Milton Roy Calcium hypo chloride & Ferric Sulfate Dosing Pump, Check Valve Assembly, Diaphragm D105, Kit type *C* plastic D105, |
Client: | | Chevron |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Tubing |
Project description | | 4 Tubes Ranging in Meters/Pcs from 12 – 20160, Length: R2, Connections: RTS-8 Pin & KSBEAR, Lb/Ft: 6.50 – 12.95, Grade: P-110 & 13CR-110 |
Client: | | Agip |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Atlas Copco Compressor Spares For Akpo Project |
Project description | | Supply of maitenance overhaul kit for operation including: 2 O Ring Check valve, HP & LP balance piston diaphragm, Drive coupling rubber set, Muffler, Check valve kit, bearing, sleeve, inlet valve overhaul kit for Atlas Copco Compressor maitenance. |
Client: | | Total |
| | |
Year Completed: | | On going |
Project: | | Supply of OMB Carbon Steel Ball Valves |
Project description: | | Supply of 2″ (50), 2″ (50), 3/4″ (20), 2″ (50), 1″ (25) & 3/4″ (20) Ball Valve Flanged Ends Long Pattern and 4″ (100), 6″(150), 3″ (80), 2″ (50), 12″ (300), 4″ (100) & 6″ (150) Ball Valve Flanged Ends Standard Pattern. |
Client: | | Saipem |
| | |
Year Completed: | | 2014 |
Project: | | Provision of Well Testing Services for Orogho and Okporhuru Wells |
Project description | | Provision of Multiphase Flow Meter Well Testing Services for Orogho and Okporhuru Wells |
Client: | | Seplat Petroleum |
| | |
Year Completed: | | 2014 |
Project: | | Repair of GRE Lines |
Project description | | Repair of 2″, 4″, 10″ & 3″ GRE Line on Total Akpo |
Client: | | Total |
| | |
Year Completed: | | 2014 |
Project: | | Design, Manufacture and Supply of Atlas Copco Instrument Air System Package |
Project description | | Design, Manufacture and Supply of Atlas Copco Air Compressor Unit 86 K 0701 1A & 1B Electrical Motor Driven (Screw type) and Components, Air Dryer Unit 86 VZ 0701 1A/B & 2A/B Heatless type and Components including On-skid Piping, Valves, Instrumentation, Electrical Accessories and structural, skid frame. |
Client: | | Saipem |
| | |
Year Completed: | | 2014 |
Project: | | Design, Manufacture and Supply of maintenance overhaul kit and complete high pressure service stage |
Project description | | Design, Manufacture and Supply of 3 maintenance overhaul kits for 16,000 hours operation (for Atlas COPCO ZR425X-10.5 Air Compressor), and 2 Complete of high pressure service stages with epoxy coated screws (for Atlas COPCO ZR425X-10.5 Air Compressor) |
Client: | | Total |
| | |
Year Completed: | | 2014 |
Project: | | Supply of Milton Roy Complete Pumps |
Project description | | Supply of 1 Milton Roy complete pump with motor (model: POMPED4610M120) and 1 Milton Roy complete pump with motor (model: POMPEMD46G10M54) |
Client: | | Indorama |
| | |
Year Completed: | | 2014 |
Project: | | Repair and Return of Sundyne Pump |
Project description | | Repair and Return of Sundyne Pump (model: LMV 311Z), 43 Components being repaired, include: oil filter, washers, seal mating ring, nuts, keys, o-rings, shaft sleeves and ball bearings. |
Client: | | Chevron |