Year Completed: | | 2016 |
Project: | | Procurement and Installation of PFP |
Project description | | Procurement and Installation of Passive Fire Protection for the Total Akpo Fire Water Rig. |
Client: | | Total |
| | |
Year Completed: | | 2016 |
Project: | | Construction and Installation of GRE pipes |
Project description | | Construction, Installation and Commissioning of 6.2″ GRE 1750PSIA Spoolable pipe from Amukpe LTF to Sapele Well 4 (Water Disposal Project) with excavation, back filling, fabrication of hook up spools and installation of fiber spar spools. |
Client: | | Seplat Petroleum Development Company PLC |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Goodwin Check Valves |
Project description | | Supply of various Check Valve 20″ 2500LB, ITCS Body, 316 SS DUAL Plate, API 594 TRIM #12, Compact Flange RTJ Class FCA21; 20″ 2500LB, ITCS Body, 316 SS DUAL Plate, API 594 TRIM #12, Compact Flange RTJ Class DCA21; 20″ 2500LB, ITCS Body, 316 SS DUAL Plate, API 594 TRIM #12, Compact Flange, TAG #=V-1073 TYPE = CD405 CLASS FCA21. |
Client: | | Chevron |
| | |
Year Completed: | | 2016 |
Project: | | Repair of GRE Lines |
Project description | | Repair of 14″ GRE Fire Water Ballast Line in Agbami FPSO |
Client: | | Chevron |
| | |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Goodwin Check Valves |
Project description | | Supply of various Check Valve 20″ Valve Check 2500LB, Compact Flange, 20GCF144 END ITCS BODY 316 SS DUAL PLATE API 594 TRIM #12 MARK CD405. |
Client: | | Chevron |
| | |
Year Completed: | | 2016 |
Project: | | Design, Manufacture and Supply Of Chemical Injection Package For OFD3 & OFD5 Ofon Project |
Project description | | Design, Manufacture and Supply and installation of 2 Chemical injection skid with double diaphragm pumps for OFD3 & OFD5, Automated stroke adjustment with ECC actuators (exproof) signal 4-20m. |
Client: | | Nigerdock Nigeria/Total |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Sundyne Compressors |
Project description | | Supply of Compressor: Plug In Replacement Sundyne LMC 333, SN D-C240044-1-A/B/C/D, Comprising of Gearbox, Mechanical Seal, Diffuser with Cover, Process Seal With Seal Housing & Impeller. |
Client: | | Chevron |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Milton Roy Pump |
Project description | | Supply of Complete Dosing Pump, Complete Dosing Pump with motor, Hexagon Socket Set Screw M4x8 CU & M8x12 CU, Oil Level Indicator, Oil Drain Plug,Coupling Flexible Element, O-Ring 6×1.5, 18.3×3.6 material FPM, Hexagon Socket Head Cap Screw M8x20 & M6x16, Air Filter, Grooved Pin, Ball D 9.52, Magnet D72x32 EP15, Ring D9.5, Mechanical Plug Kit, Valve Assembly, Discharge Check Valve, Suction Check Valve, Seat and Ball Assy, Calibration Pot 3.5L, 0.5L, 1.5L, & 0.2L – 3/4″ 150RF |
Client: | | DAEKWANG |
| | |
Year Completed: | | 2016 |
Project: | | GRE Spool Fabrication of NWP/LQP/ LQP BRIDGE/ LQP Hook-Up for DSO Project |
Project description | | Installation, Hook-Up and Tie-In of fabricated GRE spools of LQP/NWP/LQP Bridge for DSO Project |
Client: | | Hyundai Heavy Industries |
| | |
Year Completed: | | 2016 |
Project: | | Supply and Installation of Loading Arms |
Project description | | Supply and Installation of Two Marine Loading Arms at Calabar Jetty |
Client: | | PPMC Limited |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Atlas Copco Deisel Generator |
Project description | | Supply of Atlas Copco Deisel Generator, super-silenced, 200kva, 3.45M(L) x 1.18M(B) x 1.87M(H), Atlas Copco part no. QAS 200 |
Client: | | Nigerdock Nigeria PLC |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Sundyne Compressors |
Project description | | Supply of Compressors: Plug in replacement Sundyne LMC 333, SN D-C240044-1-A/B/C/D, Comprising of Gearbox, Mechanical Seal, Diffuser with Cover, Process Seal with Seal Housing & Impeller. |
Client: | | Chevron |
| | |
Year Completed: | | 2016 |
Project: | | Supply of Tubings |
Project description | | Supply of 3-1/2″ 9.2/9.3 ppf 13% CR, L80 (L13), CSH/VAM Top Range -2 (+/- 30ft). ID 2,992″ Drift, API Drift/Special Drift Rift (Premium Connection). Collapse Pressure 10,530psi, Internal Yield Pressure 10,160psi & 3-1/2″ 9.2/9.3 ppf N80, CSH/VAM Top Range -2 (+/- 30ft). ID 2,992″ Drift, API Drift/Special Drift Rift (Premium Connection). Collapse Pressure 10,530psi, Internal Yield Pressure 10,160psi. MR# 900019 |
Client: | | Seplat Petroleum Development Company Plc |