Year Completed: | 2017 |
Project: | Installation of 14″ CWC prefabricated GRE Lines |
Project description | Installation of 14″ CWC prefabricated GRE Lines (Pump A & B) in Agbami FPSO. |
Client: | Chevron/Tamex |
Year Completed: | 2017 |
Project: | Repair of Damaged Pitchar Coating |
Project description | Repair of Damaged Pitchar Coating on GRE Spools on Egina project |
Client: | Samsung Heavy Industries |
Year Completed: | 2017 |
Project: | Overhaul of Sundyne Pump |
Project description | Overhaul of Sundyne Pump for Amenam platform |
Client: | TOTAL |
Year Completed: | 2017 |
Project: | Supply of OMB 28″ Ball Valves |
Project description | Supply of OMB 28″ Ball Valves |
Client: | SPDC |
Year Completed: | 2017 |
Project: | Usan FPSO Flair Boom Extension Repair. |
Project description | The project involved repair of broken sitting and the defective sections of the flare boom in Usan FPSO. The above processes were achieved by cutting, shaving, bonding, curing, and finally reinforcing the bonded joints. It was an Exxon Mobil project but ran through Prime Atlantic Cegelec Nigeria (PACE). |
Client: | ExxonMobil (PACE) |
Year Completed: | 2017 |
Project: | Service of N110 Air compressor |
Project description | Periodic Preventive Maintenance (Service) and Corrective Maintenance (Repair) for N110 Air Compressors. |
Client: | Kimberly Clarkes W.A. Ltd |
Year Completed: | 2017 |
Project: | Commissioning of Corrosion Inhibitor Injection Pumps for K2S Project. |
Project description | Pre-start up checks, Inspection of chemical storage tanks, washing, flushing, and cleaning of chemical storage tanks, functional testing, Reliability checks, Pre-start up inspection, Commissioning, Calibration, Post-commission inspection and Training of SPDC technical teams on Operation and maintenance. |
Client: | Daewoo/SPDC |
Year Completed: | 2017 |
Project: | Repair of 10″ x 1″ & 30″ x 6″ Saddles in Agbami FPSO |
Project description | The project involved repair of leakages on 10″ X 1″ FRP Saddle and 30″ x 6″ FRP saddle in Agbami FPSO. Also, “HOT- BOLTING” in the confined space region of the FPSO. |
Client: | Hensteel Engineering/Chevron |
Year Completed: | 2017 |
Project: | Minox package in Agbami FPSO. |
Project description | Supply of materials for the installation of flow Control Valves (FCV), Saddles, and Gaskets for the Minox Package on the Agbami FPSO. Additional FRP Neoprene Gaskets were also supplied for the Minox Separator on the FPSO. |
Client: | Hensteel Engineering/Chevron/Tamex |
Year Completed: | 2017 |
Project: | Sectional Replacement of Leaking GRE Flowline at Amukpe |
Project description | The project involved repair of leak on 6” spoolable pipeline along AMUKPE right of way (ROW). Also, the repair consisted of four joints with 2 nos. pipe-to-pipe connectors. Approximately 10m of pipe length was replaced. |
Client: | Seplat |
Year Completed: | 2017 |
Project: | Field Intervention on new Milton dosing pumps |
Project description | The scope of this project included on-site inspection, replacement of failed seals and kits on pumps, tightening up loosed connections on pumps, and topping up oil level in pumps. |
Client: | Samsung Heavy Industries |
Year Completed: | 2017 |
Project: | Fabrication of Jockey Pump PCV A & B |
Project description | The project involved the fabrication of short 3″ and 4″ PVC spools for Unity FSO via Sanding; Surface preparation, bonding, and curing of joints. Also, the fabrication spools were hydro tested to confirm the integrity of the bonded joints. |
Client: | Ponticelli |
Year Completed: | 2017 |
Project: | Purchase of Piping Bulk Items – Pipes Only |
Project description | Provision of all equipment/materials services and items necessary to engineer, design, manufacture, test, inspect, paint, coat, mark, protect, transport, and deliver the Piping Bulk Items (Pipes Only) for the K2S Project – EPC for KOLO Creek to SOKU Gas Export Pipeline. |
Client: | Nestoil PLC |
Year Completed: | 2017 |
Project: | Supply of Sundyne Gearbox Assembly |
Project description | Supply of Sundyne Gearbox Assembly with Gearbox Assembly, Input RPM: 2960, Output RPM: 15232, Max Power: 298 KW, Type: NEWGB331, OEM: Sundyne, Model: LMV-331, Pump S/N: D- 99118144/45, TAG NO: 1-P-2571 A/B |
Client: | NLNG |
Year Completed: | 2017 |
Project: | Repair of damaged flare boom extension in Usan |
Project description | The project involved the repair of cracked nuts, broken sitting and defective sections of the flare Boom. |
Client: | ExxonMobil |
Year Completed: | 2017 |
Project: | Supply of Sundyne Pump |
Project description | Supply of Sundyne Centrifugal Pump with the following specifications; 3IN 600LB RF Suction/ 2IN 600LB RF Discharge CONNS, 4.1FT NPSHR, 500.7PSI Discharge Pressure, 1155FT Diff. Head, 11FT NPSHA, C/W Electric Motor, 40.0HP, 3558RPM, 460Volts, 3PH, 60HZ, 1.15 S.F, Frame 324HPZ,240V Space Heater & Inducer. |
Client: | ExxonMobil |