Year Completed:2018
Project:Commissioning of Sundyne HMD pump
Project descriptionCommissioning of Sundyne HMD pump
Client:Midwestern oil & gas company Ltd (UACN
Year Completed:2018
Project:USAN-Shutdown GRE repair campaign
Project descriptionRepair of leaking GRE lines
Client:Mobil/ PACE
Year Completed:2018
Project:Supply of 16″ and 28″ OMB Valves
Project descriptionSupply of OMB valves of various sizes including: 28″ BSE600R+,FB, CL600, OMB Ball Valves; BSE600R+, FB, CL600, DN200; BSE600RF-MTL-GO-10″, FB, CL600, OMB Actuated Ball Valves; and 16″ and 28″ OMB Valves.
Client:SPDC
Year Completed:2018
Project:SUPPLY OF BALL AND GLOBE VALVES FOR MOBIL OCIP II PROJECT.
Project descriptionSUPPLY OF BALL AND GLOBE VALVES FOR MOBIL OCIP II PROJECT.
Client:BENEPROJECTI LIMITED
Year Completed:2018
Project:Supply Of Milton Roy Pump
Project descriptionSupply of PUMP PN149V22M350 / .9.VV2 PK144R8M350 / VV2
Client:Chevron Nigeria Limited
Year Completed2018
Project TitleOverhaul of (HPGS.3X1.5X8H.DA8) Sundyne HMD Kontro pump of Amenam platform.
Project DescriptionThis project involves inspection of disassembled pumps in BOG workshop, dimensional/tolerance checks on used/new parts, pre-assembly inspection and overhauling pumps with new parts. Also included is a  functional/shop test on pumps after overhaul.
ClientTotal Nigeria
Year Completed:2018
Project:Refurbishment & Pre-commissioning of heavy-duty Biocide injection pumps at Oml 100 Odudu Field.
Project descriptionThe project involves inspection of strip pumps, performing dimensional/tolerance checks on used/new parts, pre-assembly inspection and overhauling pumps with new parts. Service will also include performing functional/shop tests on pumps after overhaul, painting pumps, carrying out pre-installation checks on pumps and ancillaries, coordinating the installation of pumps on site, commissioning, and test-run of pumps and post-commission checks on pumps.
Client:TOTAL
Project:Repair of Ingersoll Rand compressor
Project descriptionRepair of Ingersoll Rand compressor
Client:GE LNG, Rumuji
Year Completed:2018
Project:Provision of well testing services using MPFM package
Project descriptionProvision of maximum efficiency ration (MER) test in Odidi field
Client:NECONDE Energy Ltd
Year Completed:2018
Project:Retrofitting and installation of Xe 145 controller at OFD3 Ofon platform
Project descriptionRetrofitting and installation of Xe 145 controller at OFD3 Ofon platform
Client:TOTAL
Year Completed:2018
Project:GRE piping repair on Usan
Project descriptionRepair of cracked nut, broken sitting and a defective section of the flare boom
Client:Mobil/ PACE
Year Completed:2018
Project:Repair of GRE Spool
Project descriptionInstallation of 20 x 14 inches reducer and repair of damaged GRE spool in Agbami FPSO
Client:Chevron Nigeria Limited
Year Completed:2018
Project:Field intervention for Milton Roy pumps at Egina FPSO
Project descriptionField intervention for Milton Roy pumps at Egina FPSO
Client:Decatech
Year Completed:2018
Project:8000 hours service on 3 units of IR compressor and replacement of high-pressure seal on 1 unit compressor
Project description8000 hours service on 3 units of IR compressor and replacement of high-pressure seal on 1 unit compressor
Client:African Foundries LTD
Year Completed:2018
Project: EDG hose
Project descriptionCrimping of hoses for Hydraulic starter system,  Pressure 200 Barg
Client:TOTAL
Year Completed:2018
Project:Supply of 2 Milton Roy Pumps
Project descriptionSupply of 2 Milton Roy Pumps
Client:Chevron
Year Completed:2018
Project:Supply Of Sundyne Compressor
Project descriptionSupply Of Sundyne Compressor
Client:Chevron
Year Completed:2018
Project:Supply  Of Sundyne Pump
Project descriptionSupply  Of Sundyne Pump
Client:Indorama
Year Completed:2018
Project:SUPPLY OF VALVES AND FITTINGS
Project descriptionSUPPLY OF VALVES AND FITTINGS
Client:MOBIL -PRIMEBELL
Year Completed:2018
Project:Commissioning of LEWA pump (Ughelli pump station)
Project descriptionCommissioning of LEWA pump (Ughelli pump station)
Client:Daewoo
Year Completed:2018
Project:Commissioning of Ingersoll rand compressor
Project descriptionCommissioning of Ingersoll rand compressor
Client:NLNG
Year Completed:2018
Project:CHEVRON-AGBAMI FPSO-3P Mezz deck FRP line repair
Project descriptionRepair of Deck  8” FRP line
Client:CHEVRON-AGBAMI
Year Completed:2018
Project:EHRA seawater Line Repair.
Project descriptionRepair of 12” seawater GRE line to ICC
Client:Exxon Mobil
Year Completed:2018
Project:Provision of MER well testing services at the Robertkiri platform.
Project descriptionProvision of MER   Services with (MPFM) in OML-55 Field.
Client:Belema Oil Producing Ltd
Year Completed:2018
Project:Commissioning of Ingersoll Rand Nitrogen compressor.
Project descriptionCommissioning of Ingersoll Rand Nitrogen compressor for GE LNG.
Client:GE LNG, Rumuji
Year Completed:2018
Project:Field intervention on chemical injection skid at Ogbotobo flow station
Project descriptionRepair of Chemical injection skid
Client:SPDC
Year Completed:2018
Project:Alignment of Sundyne pump
Project descriptionAlignment of Sundyne pump
Client:NLNG
Year Completed:2018
Project:Fabrication of 20’’x14’’ flanged spool for Minox 2 line.
Project descriptionAgbami CWE030 20X40’’ Minox 2 line fabrication.
Client:CHEVRON/TAMEX
Year Completed:2018
Project:Installation and commissioning of XE145 controller
Project descriptionInstallation and commissioning of XE145 controller
Client:KOEB Ltd
Year Completed:2018
Project:Rehabilitation of Milton Roy dosing skids at SPDC Ogbotobo Flow station.
Project descriptionInstallation and Commissioning of three (3) MRE Chemical Injection Skids.
Client:SPDC/FREDBARO
Year Completed2018
Project TitleOverhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Project DescriptionThis project entailed performing as received inspection, disassembly and assembly, Dimensional/tolerance checks on used/new parts, pre-assembly inspection, Supply of maintenance spares, and overhauling pumps with new parts. Also included was a Hydrotest/Hydraulic test, Functional/shop test after overhaul, Pre-installation checks on pumps and ancillaries, coordination of installation, Alignment checks/measurement, commission, test-run and post-commission checks.
ClientNLNG
Year Completed:2018
Project:Supply Of Valves For  EDOP QI Valves And Traps
Project descriptionSupply and Installation of Valves (ball, Globe, Check, Gate), Stud Buts & Nuts, Gasket, and Instrumentation offerings for EDOP QI Valves and Traps.
Client:Exxon Mobil / Prime Sources Limited
Year Completed:2018
Project:Provision of MER  conventional Well Testing Services in the OML 30 Oil field.
Project descriptionProvision of MER  conventional Well Testing Services in the OML 30 Oil field.
Client:Heritage Energy
Year Completed:2018
Project:Provision of MER  MPFM for Well Testing Services.
Project descriptionProvision of MER  MPFM for Well Testing Services.
Client:NECONDE Energy Ltd
Year Completed:2018
Project:Supply of 40″ Pibiviesse Valves
Project descriptionSupply of 2 pieces of 40″ class 900 Pibiviesse Actuated Ball  Valves for Shell/NNPC pipeline project.
Client:SPDC
Year Completed:2018
Project:160kw Ingersoll Rand Air Compressor Servicing.
Project descriptionFault diagnosis/troubleshoot of 160kw Ingersoll Rand Air Compressor Servicing.
Client:African Foundries Ltd.
Year Completed:2018
Project:160kw Ingersoll Rand Air Compressor Servicing.
Project descriptionFault diagnosis/troubleshoot of 160kw Ingersoll Rand Air Compressor Servicing.
Client:African Foundaries LTD
Year Completed:2018
Repair of Damaged Pitcher Coating on GRE Spools on the Egina project.
Project descriptionThe project involves repair of damaged Pitcher passive fire protection (PFP) Coating on GRE spools in the Samsung Heavy Industries facility. Sixteen (16) GRE personnel were mobilized to carry out the repair.
Client:SHI / NOV