| Year Completed: | Completed December 2019 |
| Project: | Amenam TGC plenum support repair |
| Project description | Temporary repair of Broken TGC Plenum Support at Ameneam using GRE materials |
| Client: | Total |
| |
| |
| Year Completed: | Completed December 2019 |
| Project: | Repair of GRE lines |
| Project description | Repair of GRE lines on USAN FPSO (Facilty Shutdown) |
| Client: | Mobil/ PACE |
| |
| |
| Year Completed: | Completed December 2019 |
| Project: | Supply of Dosing Pump |
| Project description | Procurement of Milton Roy Corrosion Inhibition Dosing Pump for NLNG Bonny |
| Client: | NLNG |
| |
| |
| Year Completed: | Completed December 2019 |
| Project: | Sundyne Pump Gearbox Exchange |
| Project description | Exchange of High Thrust P-2511 Sundyne Gearbox Assembly for Pump |
| Client: | NLNG |
| |
| |
| Year Completed: | Completed December 2019 |
| Project: | Supply of Valves |
| Project description | Supply of SDV (Ball Valves) for MOBIL OCIP II Project |
| Client: | Beneprojecti Limited |
| |
| |
| Year Completed: | Completed December 2019 |
| Project: | Supply of Spares |
| Project description | Supply of Dosapro Milton Roy Spares_Valve, Ring, Seal, Washer and Check Valves for Egina Project |
| Client: | Total |
| |
| |
| Year Completed: | Completed November 2019 |
| Project: | Fabrication and Installation of GRE pipes |
| Project description | Fabrication and Installation of GRE pipes on the Chevron- Abiteye Sewage Treatment |
| Client: | Chevron/ Dorman-Long |
| |
| |
| Year Completed: | Completed November 2019 |
| Project: | Repair of GRE Pipe |
| Project description | Repair of 6-inch GRE line on Usan FPSO |
| Client: | Mobil/PACE |
| |
| |
| Year Completed: | Completed October 2019 |
| Project: | Repair of GRE Line |
| Project description | Repair of 1″ GRE line on Egina FPSO |
| Client: | Total |
| |
| |
| Year Completed: | Completed October 2019 |
| Project: | Fabrication and Installation of GRE pipes |
| Project description | Fabrication and Installation of GRE pipes on the Chevron-Agbami Minox Line |
| Client: | Chevron/Tamex |
| |
| |
| Year Completed: | Completed September 2019 |
| Project: | Installation & commissioning of Compressor |
| Project description | Installing and Commissioning of High Pressure Ingersoll Rand compressor at NLNG Bonny Location |
| Client: | NLNG |
| |
| |
| Year Completed: | Completed July 2019 |
| Project: | Procurement and installation of Pumps |
| Project description | Provision & Installation of Produced Water Degasser Pumps |
| Client: | Seplat |
| |
| |
| Year Completed: | Completed June 2019 |
| Project: | Supply of Air Receiver tank |
| Project description | Supply of 200L Pauchard Air Receiver Tank with Pressure Gauge, Safety Relief Valve snd Drain Valve for NLNG Bonny |
| Client: | NLNG |
| |
| |
| Year Completed: | Completed June 2019 |
| Project: | Supply of Valves |
| Project description | Supply of 40″ CL900 top entry Trunion Circor Ball Valves with Rotork actuators to Shell |
| Client: | SPDC |
| |
| |
| Year Completed: | Completed June 2019 |
| Project: | Fabrication Of Pressure Vessels |
| Project description | Fibreglass Reinforced Plastic (FRP) Piping Additional Scope for Exxon Mobil Ubit Restoration Project |
| Client: | AVEON Offshore |
| |
| |
| Year Completed: | Completed June 2019 |
| Project: | Provision of Well Testing Services |
| Project description | Provision of well testing services using the Multi-Phase Flow Meter package to test the various components of the Wells at OML 42 |
| Client: | NECONDE Energy Ltd |
| |
| |
| Year Completed: | Completed June 2019 |
| Project: | USAN 16″ GRE Repair Campaign |
| Project description | Replacement of 16″ CS-line with GRE Pipes |
| Client: | Mobil/PACE |
| |
| |
| Year Completed: | Completed May 2019 |
| Project: | Provision of Manpower Support Services |
| Project description | Provision of Manpower Support Services for both locals and expatriates in Agbami, Escravos Terminal, Escravos FSO, Onne and Chevron Lagos Office locations. |
| Client: | Chevron |
| |
| |
| |
| |
| Year Completed: | Completed April 2019 |
| Project: | Repair of GRE Lines. |
| Project description | Spoolable pipe leak repair at Seplat Oton. |
| Client: | Seplat |
| |
| |
| Year Completed: | Completed April 2019 |
| Project: | Fabrication, installation & testing Of Pressure Vessels |
| Project description | Exxon Mobil Ubit Restoration Project_Fabrication, installation & testing Of Pressure Vessels – Supply and fabrication of Fire Water Fibre Glass Re-inforced Plastic (FRP) piping works at OML 67 |
| Client: | Project Masters Nigeria Limited |
| |
| |
| Year Completed: | Completed April 2019 |
| Project: | Commissioning of Sundyne Compressor |
| Project description | Conformity checks were done in line with OEM specification. Confirmation of alignment, and functionality of other accessories attached to the Sundyne LMC 311F Compressor. |
| Client: | NLNG |
| |
| |
| Year Completed: | Completed April 2019 |
| Project: | Mintenance of IR compressors |
| Project description | Health check on IR compressors at BRT, EAP,& UBIT |
| Client: | Mobil |
| |
| |
| |
| Year Completed: | Completed January 2019 |
| Project: | Supply Of Valves |
| Project description | Supply Of Butech 20RV6M8P Pressure Relief valve sets for Chevron Agbami project |
| Client: | Chevron |