Year Completed: Completed December 2019
Project: Amenam TGC plenum support repair
Project description Temporary repair of Broken TGC Plenum Support at Ameneam using GRE materials
Client: Total
Year Completed: Completed December 2019
Project: Repair of GRE lines
Project description Repair of GRE lines on USAN FPSO (Facilty Shutdown)
Client: Mobil/ PACE
Year Completed: Completed December 2019
Project: Supply of Dosing Pump
Project description Procurement of Milton Roy Corrosion Inhibition Dosing Pump for NLNG Bonny
Client: NLNG
Year Completed: Completed December 2019
Project: Sundyne Pump Gearbox Exchange
Project description Exchange of High Thrust P-2511 Sundyne Gearbox Assembly for Pump
Client: NLNG
Year Completed: Completed December 2019
Project: Supply of Valves
Project description Supply of SDV (Ball Valves) for MOBIL OCIP II Project
Client: Beneprojecti Limited
Year Completed: Completed December 2019
Project: Supply of Spares
Project description Supply of Dosapro Milton Roy Spares_Valve, Ring, Seal, Washer and Check Valves for Egina Project
Client: Total
Year Completed: Completed November 2019
Project: Fabrication and Installation of GRE pipes
Project description Fabrication and Installation of GRE pipes on the Chevron- Abiteye Sewage Treatment
Client: Chevron/ Dorman-Long
Year Completed: Completed November 2019
Project: Repair of GRE Pipe
Project description Repair of 6-inch GRE line on Usan FPSO
Client: Mobil/PACE
Year Completed: Completed October 2019
Project: Repair of GRE Line
Project description Repair of 1″ GRE line on Egina FPSO
Client: Total
Year Completed: Completed October 2019
Project: Fabrication and Installation of GRE pipes
Project description Fabrication and Installation of GRE pipes on the Chevron-Agbami Minox Line
Client: Chevron/Tamex
Year Completed: Completed September 2019
Project: Installation & commissioning of Compressor
Project description Installing and Commissioning of High Pressure Ingersoll Rand compressor at NLNG Bonny Location
Client: NLNG
Year Completed: Completed July 2019
Project: Procurement and installation of Pumps
Project description Provision & Installation of Produced Water Degasser Pumps
Client: Seplat
Year Completed: Completed June 2019
Project: Supply of Air Receiver tank
Project description Supply of 200L Pauchard Air Receiver Tank with Pressure Gauge, Safety Relief Valve snd Drain Valve for NLNG Bonny
Client: NLNG
Year Completed: Completed June 2019
Project: Supply of Valves
Project description Supply of 40″ CL900 top entry Trunion Circor Ball Valves with Rotork actuators to Shell
Client: SPDC
Year Completed: Completed June 2019
Project: Fabrication Of Pressure Vessels
Project description Fibreglass Reinforced Plastic (FRP) Piping Additional Scope for Exxon Mobil Ubit Restoration Project
Client: AVEON Offshore
Year Completed: Completed June 2019
Project: Provision of Well Testing Services
Project description Provision of well testing services using the Multi-Phase Flow Meter package to test the various components of the Wells at OML 42
Client: NECONDE Energy Ltd
Year Completed: Completed June 2019
Project: USAN 16″ GRE Repair Campaign
Project description Replacement of 16″ CS-line with GRE Pipes
Client: Mobil/PACE
Year Completed: Completed May 2019
Project: Provision of Manpower Support Services
Project description Provision of Manpower Support Services for both locals and expatriates in Agbami, Escravos Terminal, Escravos FSO, Onne and Chevron Lagos Office locations.
Client: Chevron
Year Completed: Completed April 2019
Project: Repair of GRE Lines.
Project description Spoolable pipe leak repair at Seplat Oton.
Client: Seplat
Year Completed: Completed April 2019
Project: Fabrication, installation & testing Of Pressure Vessels
Project description Exxon Mobil Ubit Restoration Project_Fabrication, installation & testing Of Pressure Vessels – Supply and fabrication of Fire Water Fibre Glass Re-inforced Plastic (FRP) piping works at OML 67
Client: Project Masters Nigeria Limited
Year Completed: Completed April 2019
Project: Commissioning of Sundyne Compressor
Project description Conformity checks were done in line with OEM specification. Confirmation of alignment, and functionality of other accessories attached to the Sundyne LMC 311F Compressor.
Client: NLNG
Year Completed: Completed April 2019
Project: Mintenance of IR compressors
Project description Health check on IR compressors at BRT, EAP,& UBIT
Client: Mobil
Year Completed: Completed January 2019
Project: Supply Of Valves
Project description Supply Of Butech 20RV6M8P Pressure Relief valve sets for Chevron Agbami project
Client: Chevron