Year Completed: |
Completed December 2020 |
Project: |
Commissioning of Sundyne Compressor |
Project description: |
The Sundyne BMC 311P compressor was checked for conformity amd monitored in operation to confirm functionality. |
Client: |
Greenville LNG |
|
|
|
|
Year Completed: |
Completed December 2020 |
Project: |
Overhauling of Sundyne Pumps |
Project description: |
Decoupling, analysis and replacement of affected part of the Sundyne LMV 311 Pump. The pump was reinstalled and monitored to confirm functionality |
Client: |
NLNG |
|
|
|
|
Year Completed: |
Completed December 2020 |
Project: |
Supply of Pumps |
Project description: |
Supply of Dosapro Milton Roy XB140 Diaphram Dosing Pumps and other items for Ofon 2 Project |
Client: |
Total |
|
|
|
|
Year Completed: |
Completed November 2020 |
Project: |
Supply of Pumps |
Project description: |
Supply 2 1HP Corrosion Inhibition Pumps for Chevron Escravos |
Client: |
Chevron |
|
|
|
|
Year Completed: |
Completed November 2020 |
Project: |
Supply of Goodwin Valves |
Project description: |
Supply of 2″ CL2500RTJ Dual Plate Goodwin Check Valves to Ladol Field |
Client: |
Total |
|
|
|
|
Year Completed: |
Completed November 2020 |
Project: |
Supply of Ingersoll Rand Spares |
Project description: |
Supply of Pneumatic Winches, Gaskets, O Rings, Mufflers and Other IR Spares for Ofon 2 project |
Client: |
Total |
|
|
|
|
Year Completed: |
Completed November 2020 |
Project: |
Supply of Spares |
Project description: |
Supply of Sundyne Spares (Shaft with Gears and Low Speed Shaft Assembly to NLNG Bonny |
Client: |
NLNG |
|
|
|
|
Year Completed: |
Completed November 2020 |
Project: |
Maintenance of Ingersoll Rand Compressor |
Project description: |
Replacement of filters and coolant, functional checks on other parts were carried out on the IR SM90 air compressor according to OEM specification. |
Client: |
First Independent Power Limited (FIPL) |
|
|
|
|
Year Completed: |
Completed October 2020 |
Project: |
Commissioning of Sundyne Compressor at SEEPCO Kwale, Delta State |
Project description: |
Conformity checks were done in line with OEM specification. Confirmation of alignment, and functionality of other accessories attached to the Sundyne LMC 311F compressor. |
Client: |
Sundyne |
|
|
|
|
Year Completed: |
Completed September 2020 |
Project: |
Repair of GRE Spool |
Project description: |
Repair of 4″ GRE Spool on Ultra Filtration Rack Top Cover at USAN FPSO |
Client: |
Total |
|
|
|
|
Year Completed: |
Completed September 2020 |
Project: |
Repair of GRE Pipes on Usan FPSO |
Project description: |
Replacement and repair of the existing 4” and 8″ GRE piping system at S2 upper deck in USAN FPSO, a facility operated by Exxon Mobil.(Near Shutdown and FWP A Scopes) |
Client: |
Mobil |
|
|
|
|
|
|
Year Completed: |
Completed August 2020 |
Project: |
Fabrication of GRE Spools |
Project description: |
Fabrication of 2 Nos GRE Spools for Total EGINA Coarse Filters A and B |
Client: |
Mobil |
|
|
|
|
|
|
|
|
|
|
Year Completed: |
Completed August 2020 |
Project: |
Supply of Milton Roy Pumps |
Project description: |
Supply of 2 ZS-376100 Milton Roy Assembly Pumps and Motor for Chevron Agbami |
Client: |
Chevron |
|
|
|
|
Year Completed: |
Completed August 2020 |
Project: |
Maintenance of Compressor |
Project description: |
8000 hours service on 4 units of Ingersoll Rand RS30i compressor |
Client: |
Azura |
|
|
|
|
|
|
|
|
Year Completed: |
Completed July 2020 |
Project: |
Supply of Check Valves |
Project description: |
Supply of Nickel Alluminium Bronze BSR08-015-A+ Goodwin Check Valves to Shell Nigeria |
Client: |
SPDC |
|
|
|
|
Year Completed: |
Completed July 2020 |
Project: |
Supply of Mobile Compressor |
Project description: |
Supply of 200i,50Hz,10bar Ingersoll Rand Mobile Compressor to Bonga FPSO |
Client: |
SNEPCO |
|
|
|
|
Year Completed: |
Completed July 2020 |
Project: |
Provision of Ingersoll Rand Air Compressor |
Project description: |
Supply of Module CPN 39331657 CD14D1 IR Air Compressor Block to Shell Nigeria |
Client: |
SNEPCO |
|
|
|
|
Year Completed: |
Completed July 2020 |
Project: |
Maintenance of Ingersoll Rand Air Compressor and dryer |
Project description |
Replacement of worn parts and servicing of IR Air Compressor and dryer at Edop platform |
Client: |
Mobil |
|
|
|
|
Year Completed: |
Completed July 2020 |
Project: |
Repair of Air Dryer |
Project description |
Servicing and replacement of Ingersoll Rand Air Dryer at Edop Platform |
Client: |
Mobil |
|
|
|
|
Year Completed: |
Completed June 2020 |
Project: |
Supply of Gearbox |
Project description |
Supply of Sundyne P-1580 Gearbox Assembly for NLNG Bonny |
Client: |
NLNG |
|
|
|
|
Year Completed: |
Completed June 2020 |
Project: |
Supply of Gratings |
Project description |
Supply of Pipex PX 1MTR x 6MTR(3FT x 20FT) Standard Size FRP I-5500 38mm Series Gratings for Chevron Escravos |
Client: |
Chevron |
|
|
|
|
|
|
Year Completed: |
Completed April 2020 |
Project: |
Provision of Surface Well Testing Services |
Project description: |
Provision of Surface Well Testing Services (offshore) including all portable surface testing equipment and personnel required to unload and clean up wells upon initial completions or workovers |
Client: |
Mobil |
|
|
|
|
Year Completed: |
Completed March 2020 |
Project: |
Supply of Spares |
Project description: |
Supply of Spares – Ball Bearing, Washer Lock to Agbami FPSO |
Client: |
Total |
|
|
|
|
Year Completed: |
Completed March 2020 |
Project: |
Hydrotest of GRE lines |
Project description: |
Hydrotest of 4” GRE lines on Egina FPSO |
Client: |
Total/SHI |
|
|
|
|
Year Completed: |
Completed February 2020 |
Project: |
Supply of Atlas Copco Compressor |
Project description: |
Supply of Atlas Copco XAHS 950 CD7 Compressor to NLNG Bonny |
Client: |
NLNG |
|
|
|
|
Year Completed: |
Completed February 2020 |
Project: |
Repair of 4″ GRE lines on Egina FPSO |
Project description: |
Recovery of damaged GRE nozzles, fabrication of new ones, alignment and Bonding of two fabricated nozzles to flange and finally reinforcement. |
Client: |
Total |
|
|
|
|
Year Completed: |
Completed January 2020 |
Project: |
Repair of GRE lines |
Project description: |
Replacement and repair of the existing 4” GRE piping system atUSAN FPSO (Unit Shutdown) |
Client: |
Mobil/ PACE |