Year Completed: Completed December 2020
Project: Commissioning of Sundyne Compressor
Project description: The Sundyne BMC 311P compressor was checked for conformity amd monitored in operation to confirm functionality.
Client: Greenville LNG
Year Completed: Completed December 2020
Project: Overhauling of Sundyne Pumps
Project description: Decoupling, analysis and replacement of affected part of the Sundyne LMV 311 Pump. The pump was reinstalled and monitored to confirm functionality
Client: NLNG
Year Completed: Completed December 2020
Project: Supply of Pumps
Project description: Supply of Dosapro Milton Roy XB140 Diaphram Dosing Pumps and other items for Ofon 2 Project
Client: Total
Year Completed: Completed November 2020
Project: Supply of Pumps
Project description: Supply 2 1HP Corrosion Inhibition Pumps for Chevron Escravos
Client: Chevron
Year Completed: Completed November 2020
Project: Supply of Goodwin Valves
Project description: Supply of 2″ CL2500RTJ Dual Plate Goodwin Check Valves to Ladol Field
Client: Total
Year Completed: Completed November 2020
Project: Supply of Ingersoll Rand Spares
Project description: Supply of Pneumatic Winches, Gaskets, O Rings, Mufflers and Other IR Spares for Ofon 2 project
Client: Total
Year Completed: Completed November 2020
Project: Supply of Spares
Project description: Supply of Sundyne Spares (Shaft with Gears and Low Speed Shaft Assembly to NLNG Bonny
Client: NLNG
Year Completed: Completed November 2020
Project: Maintenance of Ingersoll Rand Compressor
Project description: Replacement of filters and coolant, functional checks on other parts were carried out on the IR SM90 air compressor according to OEM specification.
Client: First Independent Power Limited (FIPL)
Year Completed: Completed October 2020
Project: Commissioning of Sundyne Compressor at SEEPCO Kwale, Delta State
Project description: Conformity checks were done in line with OEM specification. Confirmation of alignment, and functionality of other accessories attached to the Sundyne LMC 311F compressor.
Client: Sundyne
Year Completed: Completed September 2020
Project: Repair of GRE Spool
Project description: Repair of 4″ GRE Spool on Ultra Filtration Rack Top Cover at USAN FPSO
Client: Total
Year Completed: Completed September 2020
Project: Repair of GRE Pipes on Usan FPSO
Project description: Replacement and repair of the existing 4” and 8″ GRE piping system at S2 upper deck in USAN FPSO, a facility operated by Exxon Mobil.(Near Shutdown and FWP A Scopes)
Client: Mobil
Year Completed: Completed August 2020
Project: Fabrication of GRE Spools
Project description: Fabrication of 2 Nos GRE Spools for Total EGINA Coarse Filters A and B
Client: Mobil
Year Completed: Completed August 2020
Project: Supply of Milton Roy Pumps
Project description: Supply of 2 ZS-376100 Milton Roy Assembly Pumps and Motor for Chevron Agbami
Client: Chevron
Year Completed: Completed August 2020
Project: Maintenance of Compressor
Project description: 8000 hours service on 4 units of Ingersoll Rand RS30i compressor
Client: Azura
Year Completed: Completed July 2020
Project: Supply of Check Valves
Project description: Supply of Nickel Alluminium Bronze BSR08-015-A+ Goodwin Check Valves to Shell Nigeria
Client: SPDC
Year Completed: Completed July 2020
Project: Supply of Mobile Compressor
Project description: Supply of 200i,50Hz,10bar Ingersoll Rand Mobile Compressor to Bonga FPSO
Client: SNEPCO
Year Completed: Completed July 2020
Project: Provision of Ingersoll Rand Air Compressor
Project description: Supply of Module CPN 39331657 CD14D1 IR Air Compressor Block to Shell Nigeria
Client: SNEPCO
Year Completed: Completed July 2020
Project: Maintenance of Ingersoll Rand Air Compressor and dryer
Project description Replacement of worn parts and servicing of IR Air Compressor and dryer at Edop platform
Client: Mobil
Year Completed: Completed July 2020
Project: Repair of Air Dryer
Project description Servicing and replacement of Ingersoll Rand Air Dryer at Edop Platform
Client: Mobil
Year Completed: Completed June 2020
Project: Supply of Gearbox
Project description Supply of Sundyne P-1580 Gearbox Assembly for NLNG Bonny
Client: NLNG
Year Completed: Completed June 2020
Project: Supply of Gratings
Project description Supply of Pipex PX 1MTR x 6MTR(3FT x 20FT) Standard Size FRP I-5500 38mm Series Gratings for Chevron Escravos
Client: Chevron
Year Completed: Completed April 2020
Project: Provision of Surface Well Testing Services
Project description: Provision of Surface Well Testing Services (offshore) including all portable surface testing equipment and personnel required to unload and clean up wells upon initial completions or workovers
Client: Mobil
Year Completed: Completed March 2020
Project: Supply of Spares
Project description: Supply of Spares – Ball Bearing, Washer Lock to Agbami FPSO
Client: Total
Year Completed: Completed March 2020
Project: Hydrotest of GRE lines
Project description: Hydrotest of 4” GRE lines on Egina FPSO
Client: Total/SHI
Year Completed: Completed February 2020
Project: Supply of Atlas Copco Compressor
Project description: Supply of Atlas Copco XAHS 950 CD7 Compressor to NLNG Bonny
Client: NLNG
Year Completed: Completed February 2020
Project: Repair of 4″ GRE lines on Egina FPSO
Project description: Recovery of damaged GRE nozzles, fabrication of new ones, alignment and Bonding of two fabricated nozzles to flange and finally reinforcement.
Client: Total
Year Completed: Completed January 2020
Project: Repair of GRE lines
Project description: Replacement and repair of the existing 4” GRE piping system atUSAN FPSO (Unit Shutdown)
Client: Mobil/ PACE