Year Completed: | Ongoing |
Project: | Sea Water Lift Pump (SWLP) Spool Fabrication and modification |
Project description: | Procurement, fabrication and installation of Glass Reinforced Epoxy (GRE) SWLP spools services on Agbami Floating Production Storage and Offloading (FPSO) |
Client: | Chevron Nigeria Ltd |
Year Completed: | Ongoing |
Project: | Procurement and supply Goodwin International check valve |
Project description: | Provision of 24″ Retainerless Double Flanged CLASS 150 Check Valve PIPING Goodwin International check valve |
Client: | TotalEnergies EP Nigeria |
Year Completed: | Ongoing |
Project: | Provision of Drill Bits Services |
Project description: | Provision of 6” – 26” PDC, Milled tooth insert Bi-center drill bits and associated drill bit engineering services for development, exploration for OML 30 |
Client: | Heritage Energy Operational Services Limited |
Year Completed: | Ongoing |
Project: | Corporate Call-off Contract for Supply of Bare Line Pipes and Bends |
Project description: | Provision of 14” and 36” API SPEC 5L GRADE X52 PLAIN-END BEVELLED seamless Line pipe to SPDC’s Flowlines PHC Warehouse |
Client: | Shell Petroleum Development Company of Nigeria Limited |
Year Completed: | Ongoing |
Project: | Procurement and supply of Sundyne Gearbox |
Project description: | Provision of Gearbox for LMV -311 Sundyne Centrifugal Pump for Escravos Gas to Liquid Plant operation |
Client: | Chevron Nigeria Ltd |
Year Completed: | Ongoing |
Project: | Provision of surface well testing services for KURI 2 & 3 Wells |
Project description: | Provision of Surface well testing, associated equipment, personnel, and services, for drilling, workover and testing program for KURI 2 & 7 Swamp Operations (PPL 222) |
Client: | SHN ENERGY LIMITED |
Year Completed: | Ongoing |
Project: | Procurement, fabrication and installation of Fiber Reinforced Plastics (FRP) Maintenance Services |
Project description: | Procurement, fabrication and installation of Glass Reinforced Epoxy (GRE) pipes repairs on Erha Floating Production Storage and Offloading (FPSO) |
Client: | SPIE Global Services Energy/Exxon Mobil |
Year Completed: | Dec-24 |
Project: | Provision of Technical Assistance Services |
Project description: | Provision of Technical Assistance Services (Expatriate manpower supply – Head, HVAC & Power) for Total Egina & Akpo operations |
Client: | TotalEnergies Upstream Nigeria |
Year Completed: | Nov-24 |
Project: | Procurement and Delivery of OCTG For Western Asset Drilling Operation |
Project description: | Provision of 24″ Conductor Pipes X56, 186.23 PPF X 0.75″ THICKNESS STOVE PIPE (ID = 22.5″) RANGE 3 For Western Asset Drilling |
Client: | Seplat West Limited |
Year Completed: | Nov-24 |
Project: | Provision of HydroCyclone Sand check service |
Project description: | Provision of Sand Check & Flowback services for ExxonMobil at wells UBIT 106C and UBIT 177C |
Client: | Exxon Mobil |
Year Completed: | Nov-24 |
Project: | Provision of 28inch Line Pipes |
Project description: | Procurement of 28” API 5L X52 PSL2 WT12.7MM Concrete Coated Line Pipe for OML 30 |
Client: | Heritage Energy Operational Services Limited |
Year Completed: | Sep-24 |
Project: | Provision of Chemical Injection Package |
Project description: | Provision of 2 Dosing pump module and 1 storage tank INOX 316L 1000 Litres Chemical Injection Package for Engineering, Procurement, Installation & Commissioning (EPIC) of New Boiler Project at Warri Refining & Petrochemicals Company (WRPC) |
Client: | LEE Engineering |
Year Completed: | Aug-24 |
Project: | Procurement and Delivery of OCTG |
Project description: | Provision of 44 joints of 24” 186.2ppf, 22.5”ID, X56 Conductor pipes for OML 30 |
Client: | Heritage Energy Operational Services Limited |
Year Completed: | Aug-24 |
Project: | Repair of Fiber Reinforced Plastics (FRP) Maintenance Services |
Project description: | Fabrication and Installation of 18” Glass Reinforced Epoxy (GRE) on AGBAMI Floating Production Storage and Offloading (FPSO) |
Client: | Chevron Nigeria Ltd |
Year Completed: | Jul-24 |
Project: | Provision of 28inch Line Pipes |
Project description: | Procurement of 28” API 5L X52 PSL2 WT12.7MM Concrete Coated Line Pipe for OML 30 |
Client: | Heritage Energy Operational Services Limited |
Year Completed: | Jul-24 |
Project: | Provision of Sundyne compressor |
Project description: | Provision of Sundyne Compressor LMC-311F Bare Unit with coupling / adaptor and Compressor Reliability Base Spares at OML 143 |
Client: | STERLING/ODUM |
Year Completed: | May-24 |
Project: | NLNG Train 7 Project |
Project description: | Provision of 1 1/2” – 10” High-density Polyethylene (HDPE) Pipes and Fittings (Flanges, Stub-Ends, Elbows for water applications on Train 7 of the NLNG plant |
Client: | Saipem Contracting Nigeria Ltd/Daewoo E&C JV |
Year Completed: | Apr-24 |
Project: | Fabrication, Repair and modification on ERHA FPSO |
Project description: | Procurement, fabrication and installation of Glass Reinforced Epoxy (GRE) Spacer ERHA FPSO for SWLP 4 |
Client: | SPIE Global Services Energy/Exxon Mobil |
Year Completed: | Apr-24 |
Project: | Provision of Neway Long Bolted Valves Replacement Project, Bonny Island |
Project description: | Provision of Neway 4’’ x 150# Flanged Non- Slam Axial flow type Valve,Body: ASTM A351-CF8MTRIM: AISI 316, 316L |
Client: | EVOMEC Global Services Limited/ Nigeria LNG |
Year Completed: | Mar-24 |
Project: | Provision of Rotating Equipment |
Project description: | Provision of Dosapro Milton Roy Scale Inhibitor Pump |
Client: | Chevron Nigeria Ltd |
Year Completed: | Mar-24 |
Project: | NLNG Train 7 Project |
Project description: | Provision of Field Joint Laminating Kits required for installation of Glass-fibre Reinforced Vinyl Ester (GRVE) Pipes and fittings at Bonny NLNG Train & project site. |
Client: | Saipem Contracting Nigeria Ltd/ Nigeria LNG |