Year Completed: | Ongoing |
Project: | BONGA NORTH (TRANCHE 1) PROJECT: EPCI-2 UFRI PACKAGE SCOPE |
Project description: | Manufacturing & Supply Of HRB Clad Pipes (Fatigue Sensitive) – API 5LD X65 OS / UNS N06625 OD 323.9MM X WT 21.4MM + CRA 3MM (MR/3) Production Riser -Nominal Fatigue Length – U.L: 12.2m – Both Ends Machined -API 5LD X65 OS / UNS N06625 OD 323.9MM X WT 21.4MM + CRA 3MM (MR/8) Prod Riser Critical Section – Clad – U.L: 6.5m – Both Ends Machined. – WT 21.4MM + CRA 3MM (MR/12) Prod Riser Critical Section – Clad (For NDT) – U.L: 0.4m |
Client: | SAIPEM CONTRACTING NIG LTD (SCNL)/Shell Nigeria Exploration and Production Company (SNEPCO) |
Year Completed: | Ongoing |
Project: | Procurement and Supply of OCTG For Western Asset Drilling Operations |
Project description: | Provision of 2-7/8″ 6.5 PPF N80. HYDRIL CS RANGE-2, 9-5/8 47ppf P110 Vamtop Casing, 13-3/8 68ppf K-55 BTC Casing For Western Asset Drilling |
Client: | Seplat West Limited |
Year Completed: | Ongoing |
Project: | Procurement and Delivery of Line pipes for Western Asset Drilling Operations |
Project description: | Provision of 2”-24” SCH 40&80 API 5L X52, 3LPE coated Seamless Line pipes, 2″, 4″ & 6 ” API 5L X52 3LPE Coated Epoxy Insulating Joints and 45° & 90° API 5L X52 3LPE Induction Bends for Western Asset operation |
Client: | Seplat West Limited |
Year Completed: | Ongoing |
Project: | Procurement and Delivery of OCTG |
Project description: | Provision of 44 joints of 24” 186.2ppf, 22.5”ID, X56 Conductor pipes for OML 30 |
Client: | Heritage Energy Operational Services Limited |
Year Completed: | Ongoing |
Project: | Provision of 28inch Line Pipes |
Project description: | Procurement of 28” API 5L X52 PSL2 WT12.7MM Concrete Coated Line Pipe for OML 30 |
Client: | Heritage Energy Operational Services Limited |
Year Completed: | Ongoing |
Project: | Provision of Seawater Disposal |
Project description: | Procurement, fabrication and installation of Glass Reinforced Epoxy (GRE)pipes for Seawater Disposal Caisson Overboard on Erha Floating Production Storage and Offloading (FPSO) |
Client: | LES ENERGY/ExxonMobil |
Year Completed: | Ongoing |
Project: | Provision of Technical Assistance Services |
Project description: | Provision of Technical Assistance Services (Expatriate manpower supply – Head, HVAC & Power) for Total Egina & Akpo operations |
Client: | TotalEnergies Upstream Nigeria |
Year Completed: | Ongoing |
Project: | Procurement and Delivery of DIBI NORTH 6KM 18IN Line Pipes |
Project description: | Provision of 18.00 0″ OD, 0. 938″ WT CS, A PI 5L -B PS L 2 Modified, Seamless, ASM E B3 6.10 M, Externally Coated with 20 Milfusion Bonded Epoxy Line Pipes for DIBI North 6KM project |
Client: | Chevron Nigeria Ltd |
Year Completed: | Feb-25 |
Project: | Provision of Chemical Injection Skid for HCL Injection |
Project description: | Engineering, procurement and construction of Hydrochloric Acid Injection Package with Glass reinforced Plastic (GRP) Pipe with Special tool: Damper charging kit and Archor Bolts at Nigeria LNG Port Harcourt warehouse |
Client: | Hoechy Development Limited/Nigeria LNG Limited |