Two (2) field service engineers from the Rotating Equipment Team engaged in repair works on a centrifugal Sundyne pump (LMV 311) at the Nigeria Liquefied Natural Gas Company (NLNG), Bonny, River State. The overhaul, which lasted 12 days, is used for Liquefied Petroleum Gas (LPG) re-injection in the NLNG plant. It transfers LPG into the injection system. With this repair, the NLNG can meet up her targeted volume of gas production per day.