Two (2) field service engineers from the Rotating Equipment Team engaged in repair works on a centrifugal Sundyne pump (LMV 311) at the Nigeria Liquefied Natural Gas Company (NLNG), Bonny, River State. The overhaul, which lasted 12 days, is used for Liquefied Petroleum Gas (LPG) re-injection in the NLNG plant. It transfers LPG into the injection system. With this repair, the NLNG can meet up her targeted volume of gas production per day.
![a-bog-field-service-engineer-during-the-repair-of-a-centrifugal-sundyne-pump-at-nlng-bonny-rivers-state](http://www.belloil.com/wp-content/uploads/2016/10/A-BOG-field-service-engineer-during-the-repair-of-a-centrifugal-Sundyne-Pump-at-NLNG-Bonny-Rivers-State.jpg)