On 5th October 2015, four (4) Glass Fibre Reinforced Epoxy Pipe Systems (GRE) personnel embarked on GRE and PVDF repair works at the Akpo FPSO.
Project Overview: the project involved the following:
- Leak repair on 2” PVDF line-TP05 hypochlorite for sea water lift pump on upper deck.
- Leak repair on 4” GRE flanged spool for sea water coarse filter A on main deck.
- Leak repair on 4” X 2” GRE line for P4 on top deck.
- Temporary leak repair on 20” GRE line for S1 on hull deck.
The job lasted for six (6) days.
At the end, the project objectives were completely met. BOG successfully delivered a fit-for-purpose repair for immediate use.
BOG personnel repairing the leak on 20” GRE line for S1 on hull deck 2