Rotating Equipment Maintenance Work at NLNG
Two (2) BOG personnel were involved in the repair of a Sundyne Pump at the Nigerian Liquefied National Gas (NLNG), Bonny Island, Rivers State. Sundyne pumps are used for Liquefied Petroleum Gas (LPG) re-injection in the NLNG plant. They transfer LPG into the injection system. The pump had a drop in oil pressure which led […]
Ingersoll Rand’s Visit
In May 2019, Ingersoll Rand(IR)’s, Regional Technical Lead, North French and West Africa (NFWA), Michel Cure, visited BOG office in Port Harcourt to train members of the Rotating Equipment (RE) team. IR is a diversified industrial manufacturer of compressor systems, power tools, ARO pumps and lifting and material handling equipment. BOG is the Channel Partner […]
Sundyne Visits BOG
Sundyne is an industry leader in the design, manufacture and support of centrifugal compressors and pumps, delivering quality fluid handling solutions for a broad range of industrial applications in the Upstream Oil & Gas, midstream, natural gas production, hydrocarbon processing (refining and petrochemical), chemical processing, power generation, mining and mineral processing, metals and steel pickling, […]
BOG, Daewoo Strenghten Ties
BOG continues to strengthen its relationship with companies in Nigeria’s Oil and Gas industry. In May 2019, four representatives of Daewoo Nigeria Limited visited our facility in Port Harcourt. The purpose of the visit was to get better acquainted with our offerings and capabilities. Daewoo Nigeria is an Engineering, Procurement and Construction (EPC) company operating […]
Mobil Ubit Fabrication Project
The Ubit Field is located in Oil Mining Lease (OML) 67 southeast of the Niger Delta. It is a Joint Venture (JV) of the Nigerian National Petroleum Corporation and Mobil Producing Nigeria. Ubit has approximately 2.4 billion barrels of oil. It came into existence in the early 1970s and comprises of a number of satellite […]
Well Testing Campaign at Neconde’s Odidi Field
BOG continues to provide reliable Well Testing services to its numerous clients. This time, BOG mobilized a four-man team from our Well Testing Department and our Multi-Phase Flow Meter (MPFM) to the Neconde/Nigerian Petroleum Development Company (NPDC) Odidi Field to carry out Maximum Efficiency Rate (MER) tests on all flowing wells for product optimization. This […]
Hose Fabrication for Total Amenam Shutdown
Recently, members of BOG’s Hydraulics Team fabricated 5 metric tonnes crane hoses at BOG’s Hydraulic Workshop in Port Harcourt. The hoses were used for maintenance work during the Total Exploration and Production Shutdown on Amenam Platform. The Amenam Platform is located offshore in the Amenam-Kpono Field, astride offshore blocks OML 99 and OML 70, about […]
Repair Works on USAN FPSO
On this project, BOG has partnered with Prime Atlantic Cegelec (PACE) to deliver Glassfibre Re-inforced Epoxy (GRE) repair works to USAN Floating, Production Storage and Offloading (FPSO) platform – an ExxonMobil facility. The Usan FPSO is located about 60 miles south off the coast of Nigeria in the Gulf of Guinea. Usan began producing in […]
Abiteye Sewage Disposal Line Project
This project is about installing a new sewage line in Abiteye facility, owned by Chevron Nigeria Limited (CNL). Abiteye Oil Field is a 42,000 a day crude oil flowstation located in Southern Nigeria. The scope of work is limited to Glassfibre Re-inforced Epoxy (GRE) pipes fabrication, installation and hydro test. It will be of immense […]
QHSE Forum for External Providers
Quality, Health, Safety and Environment (QHSE) stands for four components of a responsible corporate management approach based on the belief that all accidents are caused by human error and are, therefore, preventable with better training and administration. BOG takes QHSE very seriously due to its value in preventing workplace incidences and importance in the oil […]